Disassembly sequence planning based on modularization

被引:0
|
作者
机构
来源
| 2005年 / Institute of Computing Technology, Beijing, China卷 / 17期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
Exponential explosion during the process of disassembly sequence generation has become a bottleneck for a long time due to over large number of parts included in the product. To solve this problem, an approach based on the modularization is proposed in the paper to generate the disassembly sequence. In the approach, we construct a modularization disassembly model where the Hierarchy Network Graph of product is created automatically. The precedence constraints related to the hierarchy network graph are analyzed, and the process of generating the disassembly sequence is described. A case study is also given to show that the method is feasible and effective.
引用
收藏
相关论文
共 50 条
  • [31] MULTIPLE-TARGET SELECTIVE DISASSEMBLY SEQUENCE PLANNING WITH DISASSEMBLY SEQUENCE STRUCTURE GRAPHS
    Smith, Shana
    Chen, Wei-Han
    PROCEEDINGS OF THE ASME INTERNATIONAL DESIGN ENGINEERING TECHNICAL CONFERENCES AND COMPUTERS AND INFORMATION IN ENGINEERING CONFERENCE 2012, VOL 3, PTS A AND B, 2012, : 1305 - 1314
  • [32] Partial disassembly sequence planning based on Pareto ant colony algorithm
    Xing Yu-Fei
    Liu Qiang
    PROCEEDINGS OF THE 28TH CHINESE CONTROL AND DECISION CONFERENCE (2016 CCDC), 2016, : 4804 - 4809
  • [33] A graph-based disassembly sequence planning for EOL product recycling
    Zhang, HC
    Kuo, TC
    TWENTY FIRST IEEE/CPMT INTERNATIONAL ELECTRONICS MANUFACTURING TECHNOLOGY SYMPOSIUM, 1997, : 140 - 151
  • [35] Product cooperative disassembly sequence and task planning based on genetic algorithm
    Yongting Tian
    Xiufen Zhang
    Zehua Liu
    Xingyue Jiang
    Junfang Xue
    The International Journal of Advanced Manufacturing Technology, 2019, 105 : 2103 - 2120
  • [36] Product cooperative disassembly sequence and task planning based on genetic algorithm
    Tian, Yongting
    Zhang, Xiufen
    Liu, Zehua
    Jiang, Xingyue
    Xue, Junfang
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2019, 105 (5-6): : 2103 - 2120
  • [37] A novel disassembly sequence planning method based on spatial constraint matrices
    Fei Wang
    Yanrong Yang
    Xiaoke Ji
    Qianlin Yang
    Yang Li
    Jianyang Liu
    The International Journal of Advanced Manufacturing Technology, 2023, 124 : 3001 - 3010
  • [38] A novel disassembly sequence planning method based on spatial constraint matrices
    Wang, Fei
    Yang, Yanrong
    Ji, Xiaoke
    Yang, Qianlin
    Li, Yang
    Liu, Jianyang
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2023, 124 (09): : 3001 - 3010
  • [39] Ant colony optimization algorithm-based disassembly sequence planning
    Shan, Hongbo
    Li, Shuxia
    Huang, Jing
    Gao, Zhimin
    Li, Wei
    2007 IEEE INTERNATIONAL CONFERENCE ON MECHATRONICS AND AUTOMATION, VOLS I-V, CONFERENCE PROCEEDINGS, 2007, : 867 - +
  • [40] Partial disassembly sequence planning based on cost-benefit analysis
    Smith, Shana
    Hsu, Li-Yen
    Smith, Gregory C.
    JOURNAL OF CLEANER PRODUCTION, 2016, 139 : 729 - 739