Blockchain-integrated zero-knowledge proof system for privacy-preserving near-miss reporting in construction projects

被引:4
作者
Nyato, Eric Joshua [1 ]
Kimito, Emmanuel [2 ]
Yang, Jaehun [2 ]
Lee, Doyeop [2 ]
Lee, Dongmin [2 ]
机构
[1] Chung Ang Univ, Sch Civil & Environm Engn, Seoul 06974, South Korea
[2] Chung Ang Univ, Sch Architecture & Bldg Sci, Seoul 06974, South Korea
基金
新加坡国家研究基金会;
关键词
Proactive construction safety management; Zero-knowledge proof; Layer-2; blockchain; Near-miss reporting; Decentralized application; Anonymity; SAFETY; ACCIDENTS; INDICATORS; INJURIES; COSTS;
D O I
10.1016/j.autcon.2024.105825
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Effective management of near-miss data is essential for proactive safety practices in construction. Traditional reporting and management methods face challenges such as data loss, susceptibility to manipulation, and poor traceability, which undermine their reliability and collaborative efforts. Blockchain technology can enhance data integrity, security, transparency, and reliability in safety data management. However, conventional Layer-1 blockchain systems require third-party verification processes, compromising participant anonymity-crucial for effective near-miss reporting and incur high transaction fees, presenting several practical concerns. To address these issues, this paper developed and tested a zero-knowledge proof and Layer-2 blockchain integrated system for near-miss reporting. This system was validated through a proof-of-concept and hypothetical case study, achieving perfect unlinkability with a degree of anonymity scored at d = 1 and reducing the cost of report submission to USD 0.0011. These advances significantly contribute toward proactive safety management in construction by facilitating safe reporting environments and cost-effective near-miss management.
引用
收藏
页数:18
相关论文
共 85 条
[31]  
Kilian J., 1992, Proceedings of the Twenty-Fourth Annual ACM Symposium on the Theory of Computing, P723, DOI 10.1145/129712.129782
[32]  
2020, J SYSTEM MANAGE SCI, DOI [10.33168/jsms.2020.0106, 10.33168/JSMS.2020.0106, DOI 10.33168/JSMS.2020.0106]
[33]   Blockchain integration into electronic document management (EDM) system in construction common data environment [J].
Kiu, Mee San ;
Lai, Kai Wen ;
Chia, Fah Choy ;
Wong, Phui Fung .
SMART AND SUSTAINABLE BUILT ENVIRONMENT, 2024, 13 (01) :117-132
[34]  
Kong L ..., 2024, Zero-knowledge Proof for Trusted Construction Management: A Preliminary Study of Adaptive Blockchain BIM Identity Authentication
[35]  
지성민, 2011, [Korean Journal of Construction Engineering and Management, 한국건설관리학회 논문집], V12, P3
[36]   Digital twin-driven deep reinforcement learning for adaptive task allocation in robotic construction [J].
Lee, Dongmin ;
Lee, SangHyun ;
Masoud, Neda ;
Krishnan, M. S. ;
Li, Victor C. .
ADVANCED ENGINEERING INFORMATICS, 2022, 53
[37]   Sensor-Integrated Hybrid Blockchain System for Supply Chain Coordination in Volumetric Modular Construction [J].
Lee, Dongmin ;
Wen, Leyang ;
Choi, Jin Ouk ;
Lee, SangHyun .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2023, 149 (01)
[38]  
Lee Jae-Hee, 2021, [Korean Journal of Construction Engineering and Management, 한국건설관리학회 논문집], V22, P116
[39]   Factors Influencing the Adoption of Blockchain in the Construction Industry: A Hybrid Approach Using PLS-SEM and fsQCA [J].
Li, Chunhao ;
Zhang, Yuqian ;
Xu, Yongshun .
BUILDINGS, 2022, 12 (09)
[40]   Research on Near-Miss Incidents Monitoring and Early Warning System for Building Construction Sites Based on Blockchain Technology [J].
Li, Meng ;
Lin, Qi ;
Jin, Hongyu .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2023, 149 (12)