Environmntal signals acquisition for an early warning system

被引:0
作者
Guillot J.D. [1 ,2 ]
Robles C.A. [2 ]
Callejas J.D. [1 ]
机构
[1] Facultad de Ingeniería, Universidad Cooperativa de Colombia, Troncal Del Caribe, Sector Mamatoco, Santa Marta
[2] Facultad de Ingeniería, Universidad Del Magdalena, Carrera 32, Santa Marta
来源
Informacion Tecnologica | 2017年 / 28卷 / 05期
关键词
Acquisition system; Early warning system; Rainfall; Soil moisture; Water level;
D O I
10.4067/s0718-07642017000500007
中图分类号
学科分类号
摘要
This article presents a prototype of environmental signal acquisition system as part of an early warning system, in order to manage possible floods in the Manzanares river basin in Santa Marta, Colombia. The system aims to monitor the soil moisture, rainfall and water level of the site under study, as well as register, store and send these variables in real time through the cellular network. The prototype responds satisfactorily in different test conditions, acquiring the environmental signals and sending remotely to the server. With the performed configuration, sensors show stable output and good response to sudden changes in soil moisture and water level. The acquisition device represents an achievement in terms of low cost hardware integration for risk mitigation due to flooding.
引用
收藏
页码:45 / 54
页数:9
相关论文
共 50 条
[41]   Theoretical Framework for Early Warning System in Project Management [J].
Pisz, Iwona ;
Lapunka, Iwona ;
Wittbrodt, Piotr .
INNOVATION MANAGEMENT AND EDUCATION EXCELLENCE VISION 2020: FROM REGIONAL DEVELOPMENT SUSTAINABILITY TO GLOBAL ECONOMIC GROWTH, VOLS I - VI, 2016, :1038-1048
[42]   The design and research of an Earthquake Early Warning System for Railways [J].
Ye Ke ;
Guo Yong .
2011 INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE AND NETWORK TECHNOLOGY (ICCSNT), VOLS 1-4, 2012, :682-685
[43]   Early Warning System for Shock Points on the Road Surface [J].
Phan Duy Hung .
COOPERATIVE DESIGN, VISUALIZATION, AND ENGINEERING, CDVE 2020, 2020, 12341 :302-311
[44]   FlaFloM - an early warning system for flash floods in Egypt [J].
Vanderkimpeni, P. ;
Rocabado, I. ;
Cools, J. ;
El-Sammany, M. ;
Abdelkhalek, A. .
FLOOD RECOVERY, INNOVATION AND RESPONSE II, 2010, 133 :193-202
[45]   Towards a leptospirosis early warning system in northeastern Argentina [J].
Lotto Batista, Martin ;
Rees, Eleanor M. ;
Gomez, Andrea ;
Lopez, Soledad ;
Castell, Stefanie ;
Kucharski, Adam J. ;
Ghozzi, Stephane ;
Mueller, Gabriela V. ;
Lowe, Rachel .
JOURNAL OF THE ROYAL SOCIETY INTERFACE, 2023, 20 (202)
[46]   Introducing the overall risk scoring as an early warning system [J].
Pehlivanli, Davut ;
Alp, Elcin Aykac ;
Katanalp, Bilge .
EXPERT SYSTEMS WITH APPLICATIONS, 2024, 246
[47]   Early Warning System and Man-Made Noise [J].
Kislov, Konstantin ;
Vinberg, Fedor ;
Kushnir, Aleksandr ;
Gravirov, Valentin .
2012 IV INTERNATIONAL CONFERENCE PROBLEMS OF CYBERNETICS AND INFORMATICS (PCI), 2012,
[48]   Early Warning System for Temporary Crime Hot Spots [J].
Gorr, Wilpen L. ;
Lee, YongJei .
JOURNAL OF QUANTITATIVE CRIMINOLOGY, 2015, 31 (01) :25-47
[49]   Driver's Biocybernetic Monitoring and Early Warning System [J].
Mitas, Andrzej W. ;
Rygula, Artur ;
Pycinski, Bartlomiej .
TELEMATICS IN THE TRANSPORT ENVIRONMENT, 2012, 329 :52-+
[50]   Willingness to pay for an early warning system for infectious diseases [J].
Himmler, Sebastian ;
van Exel, Job ;
Perry-Duxbury, Meg ;
Brouwer, Werner .
EUROPEAN JOURNAL OF HEALTH ECONOMICS, 2020, 21 (05) :763-773