共 50 条
- [1] Shinkansen electric inspection train designed for the inspection of single-step brake control in the Tokaido Shinkansen Japanese Railway Engineering, 2006, (157): : 8 - 10
- [2] Maintenance of electrical facilities of Shinkansen utilizing multipurpose inspection train Japanese Railway Engineering, 1995, (132-133): : 11 - 17
- [3] The train detecting equipment using loop coils for the automatic train coupling system on Shinkansen lines 1999 IEEE 49TH VEHICULAR TECHNOLOGY CONFERENCE, VOLS 1-3: MOVING INTO A NEW MILLENIUM, 1999, : 2278 - 2282
- [4] Train scheduling of Shinkansen and relationship to reliable train operation COMPUTERS IN RAILWAYS XII: COMPUTER SYSTEM DESIGN AND OPERATION IN RAILWAYS AND OTHER TRANSIT SYSTEMS, 2010, 114 : 133 - 139
- [5] Digital automatic train control system for the shinkansen lines of East Japan Railway Company COMPUTERS IN RAILWAYS VIII, 2002, 13 : 83 - 92
- [6] Train scheduling of Shinkansen and relationship to reliable train operation WIT Trans. Built Environ., (133-139):
- [8] Automatic train operation system for the high speed Shinkansen train Computers in Railways X: Computer System Design and Operation in the Railway and Other Transit Systems, 2006, 88 : 441 - 446
- [9] An expert system for train operation adjustment of Shinkansen TRANSPORTATION SYSTEMS 1997, VOLS 1-3, 1997, : 1145 - 1150
- [10] New train control system of Tokaido Shinkansen COMPUTERS IN RAILWAYS VII, 2000, 7 : 1195 - 1203