New overhead line equipment on existing structures of Great Eastern route

被引:0
|
作者
Wili, Urs [1 ]
Wittig, Mike [1 ]
机构
[1] Furrer+Frey AG, Thunstr. 35, 3000 Berne 6, Switzerland
来源
eb - Elektrische Bahnen | 2009年 / 107卷 / 07期
关键词
D O I
暂无
中图分类号
TM75 [线路及杆塔];
学科分类号
摘要
The Great Eastern route, from London Liverpool Street via Shenfield to Chelmsford and Southend-on-Sea is equipped with 60-year old overhead line equipment with fixed termination conductors. For the 2012 Olympics the performance and reliability of the line have to be improved for the increasing number of trains and a speed of up to 160 km/h with three pantographs per train. This busy line can only afford a limited number and duration of service suspensions which would be insufficient to allow the complete renewal of the overhead line. For this reason, a new overhead line system had to be designed which can be mounted on the existing structures.
引用
收藏
页码:306 / 312
相关论文
共 50 条
  • [1] Great Western railway electrification, UK: foundations for overhead line equipment
    Esser, Jonathan
    Lethbridge, Richard
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 2020, 173 (06) : 47 - 53
  • [2] 60MHZ LINE EQUIPMENT FOR AN EXISTING COAXIAL CABLE ROUTE
    BECKER, L
    SIMOTTA, W
    ELECTRICAL COMMUNICATION, 1978, 53 (03): : 207 - 212
  • [3] Mitigation of ancient coal mining hazards to overhead line equipment structures
    Haiderali, Aliasger E.
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-TRANSPORT, 2020, 173 (04) : 218 - 231
  • [4] Capacity assessment of existing corroded overhead power line structures subjected to synoptic winds
    Niu, Huawei
    Li, Xuan
    Zhang, Wei
    WIND AND STRUCTURES, 2018, 27 (05) : 325 - 336
  • [5] Wind action on overhead contact line equipment
    Schmidt, Peter
    Schulz, Helge
    Berthold, Gunter
    Kiessling, Friedrich
    eb - Elektrische Bahnen, 2001, 99 (09): : 378 - 385
  • [6] MAINTENANCE OF ELECTRIC TRACTION OVERHEAD LINE EQUIPMENT
    BOISSONNADE, P
    FRENCH RAILWAY TECHNIQUES, 1978, (04): : 238 - 247
  • [7] OVERHEAD EQUIPMENT FOR BR MAIN LINE ELECTRIFICATION
    GOLDRING, AG
    INTERNATIONAL CONFERENCE ON MAIN LINE RAILWAY ELECTRIFICATION, 1989, 312 : 139 - 143
  • [8] AERODYNAMIC PROBLEMS WITH OVERHEAD LINE EQUIPMENT.
    Gawthorpe, Roger G.
    1978, 3 (04): : 38 - 40
  • [9] Channel Modeling for Overhead Line Equipment for Train Communication
    Gheth, Waled
    Rabie, Khaled M.
    Adebisi, Bamidele
    Ijaz, Muhammad
    Harris, Georgina D.
    2020 IEEE INTERNATIONAL SYMPOSIUM ON POWER LINE COMMUNICATIONS AND ITS APPLICATIONS (IEEE ISPLC), 2020,
  • [10] The design of railway overhead line equipment mast foundations
    Powrie, William
    Richards, David J.
    Mootoosamy, Vaneshen K. S.
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-GEOTECHNICAL ENGINEERING, 2020, 173 (05) : 428 - 447