共 17 条
- [1] ZHAO Guotang, ZHAO Rufeng, LIU Junfei, Settlement Deformation Source, Delormation Transler and Track Irregularity Control Method ol High-speed Railway Subgrade alter Construction [J], Journal ol Railway Science, 42, 12, pp. 127-134, (2020)
- [2] XU Yangyang, WANG Shandong, ZHAI Fulei, Et al., Improved Hyperbolic Settlement Prediction Model Based on Wavelet De-noising [J], Journal of Geomatics, 45, 5, pp. 43-47, (2020)
- [3] LU Fumin, JIANG Tingyao, Application ol Kalman Filter Method Based on Hyperbolic Curve Model in the Settlement Forecast ol Building [J], Journal ol Geodesy and Geodynam-ics, 36, 6, pp. 517-519, (2016)
- [4] LENG Wuming, ZHOU Siwei, NIE Rusong, Et al., Monitoring Analysis and Prediction ol Longitudinal Differential Settlement ol Track Structure in Bridge and Road Transitional Section ol Existing Heavy-haul Railway, Journal ol Railway Science, 43, 6, pp. 150-157, (2021)
- [5] CHEN Shanxiong, WANG Xingyun, XU Xichang, Et al., Three-point Modified Exponential Curve Method for Predicting Sub-grade Settlements [J], Rock and Soil Mechanics, 32, 11, pp. 3355-3360, (2011)
- [6] HU Qizhi, TIAN Kun, LI Ming, Comparison of Settlement Prediction Methods for Soft Soil Subgrade under Heap Load Preloading, China Sciencepaper, 14, 10, pp. 1111-1116, (2019)
- [7] YUAN Dinghui, YIN Lihua, ZHANG Chao, Et al., Consistency Analysis of Methods for Subgrade Settlement Prediction Based on Curve Fitting[J], Subgrade Engineering, 5, pp. 74-78, (2020)
- [8] WANG Haiying, CHANG Xiao, RUAN Qi, Et al., Subsidence Prediction ol Subgrade Filled by Construction Waste Based on Three Point-hoshino Algorithm [J], Journal ol Railway Science and Engineering, 14, 3, pp. 473-479, (2017)
- [9] Error Theory and Foundation ol Surveying Adjustment [M ], (2014)
- [10] HUANG Dongleng, YAO Wanqiang, SHI Jingjian, Et al., Re-research on the Iterative Formula ol Sequential Adjustment, Journal ol Geomatics, 43, 4, pp. 88-91, (2018)