Enhancing the performance of integer models for addressing the long-term production planning problem in open pit mines by decision variable fixation based on parametric analysis of the final pit limit

被引:0
|
作者
Hasozdemir, Kursat. [1 ]
Erçelebi, Selamet Gürbüz. [1 ]
机构
[1] Mining Engineering Department, Istanbul Technical University, Istanbul
来源
Mining Science and Technology (Russian Federation) | 2024年 / 9卷 / 02期
关键词
fixing decision variables; integer programming; long-term production scheduling; open-pit mining; optimization; production scheduling; pseudoflow;
D O I
10.17073/2500-0632-2023-09-156
中图分类号
学科分类号
摘要
The importance of strategic mine planning to ensure the long-term viability of mining projects has increased significantly because of the limited availability of high-grade ore deposits. Given its high-dimensional and combinatorial nature, developing a precise mathematical optimization technique to solve the entire problem remains challenging, particularly for real-size block models. The primary objective of this study was to propose a method that combines a nested pit strategy with integer programming (IP) models to overcome computational limitations by reducing the problem’s complexity, decreasing solution times, and providing insights into alternative production schedules for large-scale open-pit mines. The proposed algorithm strategically fixes the decision variables based on parametric analysis of the ultimate pit limit to simplify the IP model. The approach was applied to various block models from MineLib, and the results were compared with standard IP solutions and findings from related studies using alternative algorithms. Applying the proposed method demonstrated significant reductions in the solution time (up to 95%) and the ability to solve intractable models. © Hasozdemir K., Erçelebi S. G., 2024.
引用
收藏
页码:74 / 84
页数:10
相关论文
共 9 条
  • [1] A practical, long-term production scheduling model in open pit mines using integer linear programming
    Gholamnejad, J.
    Lotfian, R.
    Kasmaeeyazdi, S.
    JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY, 2020, 120 (12) : 665 - 670
  • [2] Improvement of Lagrangian relaxation performance for open pit mines constrained long-term production scheduling problem
    Moosavi, E.
    Gholamnejad, J.
    Ataee-pour, M.
    Khorram, E.
    JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2014, 21 (07) : 2848 - 2856
  • [3] A CHANCE CONSTRAINED INTEGER PROGRAMMING MODEL FOR OPEN PIT LONG-TERM PRODUCTION PLANNING
    Gholamnejad, J.
    Osanloo, M.
    Khorram, E.
    INTERNATIONAL JOURNAL OF ENGINEERING, 2008, 21 (04): : 407 - 418
  • [4] Effective solution of the long-term open pit production planning problem using block clustering
    Lotfian, Reza
    Gholamnejad, Javad
    Mirzaeian Lardkeyvan, Yousef
    ENGINEERING OPTIMIZATION, 2021, 53 (07) : 1119 - 1134
  • [5] A hybrid augmented Lagrangian multiplier method for the open pit mines long-term production scheduling problem optimization
    E. Moosavi
    J. Gholamnejad
    M. Ataee-pour
    E. Khorram
    Journal of Mining Science, 2014, 50 : 1047 - 1060
  • [6] A hybrid augmented Lagrangian multiplier method for the open pit mines long-term production scheduling problem optimization
    Moosavi, E.
    Gholamnejad, J.
    Ataee-pour, M.
    Khorram, E.
    JOURNAL OF MINING SCIENCE, 2014, 50 (06) : 1047 - 1060
  • [7] A stochastic particle swarm based model for long term production planning of open pit mines considering the geological uncertainty
    Gilani, Seyyed-Omid
    Sattarvand, Javad
    Hajihassani, Mohsen
    Abdullah, Shahrum Shah
    RESOURCES POLICY, 2020, 68
  • [8] A simulated annealing based stochastic long-term production scheduling of open-pit mines with stockpiling under grade uncertainty
    Danish, Abid Ali Khan
    Khan, Asif
    Muhammad, Khan
    INTERNATIONAL JOURNAL OF MINING RECLAMATION AND ENVIRONMENT, 2023, 37 (01) : 43 - 65
  • [9] An optimisation approach for uncertainty-based long-term production scheduling in open-pit mines using meta-heuristic algorithms
    Tolouei, Kamyar
    Moosavi, Ehsan
    Tabrizi, Amir Hossein Bangian
    Afzal, Peyman
    Bazzazi, Abbas Aghajani
    INTERNATIONAL JOURNAL OF MINING RECLAMATION AND ENVIRONMENT, 2021, 35 (02) : 115 - 140