Research on key technologies of substation planning considering distributed power access

被引:0
|
作者
Pan Q. [1 ]
机构
[1] Yangzhou Power Supply Branch, State Grid Jiangsu Electric Power Co., Ltd., Yangzhou
来源
Dianli Xitong Baohu yu Kongzhi/Power System Protection and Control | 2021年 / 49卷 / 06期
关键词
Confidence capacity; Cost model; Distributed power supply; Planning method; Substation;
D O I
10.19783/j.cnki.pspc.200623
中图分类号
学科分类号
摘要
There can be problems of waste of investment and low equipment utilization in traditional substation planning. To help solve these problems a full life cycle cost model for substation location and capacity is constructed. We take the confidence capacity evaluation method of distributed power sources and the capacity of substations, and the traditional substation planning method based on the weighted Voronoi diagram. From this we develop an optimized planning method for large-scale access of distributed power sources to substations. The validity and practicability of the proposed method are verified by calculation examples. Experiments show that the proposed method can effectively reduce the planned capacity of the power grid, improve the level of refinement of the power grid, and has good practicability. © 2021 Power System Protection and Control Press.
引用
收藏
页码:98 / 104
页数:6
相关论文
共 27 条
  • [1] TANG Quan, XU Weiting, YE Xi, Et al., Optimal configuration of distributed energy storage system in distribution network with the participation of aggregators, Power System Protection and Control, 47, 17, pp. 83-92, (2019)
  • [2] LIU Keyan, SHENG Wanxing, ZHANG Dongxia, Et al., Big data application requirements and scenario analysis in smart distribution network, Proceedings of the CSEE, 35, 2, pp. 287-293, (2015)
  • [3] LU Chang, GUO Li, CHAI Yuanyuan, Et al., Day ahead optimal dispatching method of incremental distribution network with high penetration distributed photovoltaic, Power System Protection and Control, 47, 18, pp. 90-98, (2019)
  • [4] LIANG Tangjie, XIE Qing, LIU Chunfang, Et al., Comprehensive benefit evaluation of distribution network planning based on the life cycle cost theory and the cloud matter element theory, Power System Protection and Control, 45, 19, pp. 12-17, (2017)
  • [5] ZENG Weidong, TIAN Shuang, YUAN Yahui, Et al., Design and implementation of automatic combustion control system for waste incinerator, Thermal Power Generation, 48, 3, pp. 109-113, (2019)
  • [6] QIU Yutao, HU Xueping, LING Guang, Et al., Research on relay protection standard system of intelligent substation of state grid corporation, Power System Protection and Control, 45, 20, pp. 7-13, (2017)
  • [7] FU Zhongguang, LIU Binghan, WANG Pengkai, Et al., Comprehensive evaluation model for performance indicators of gas-fired power plants, Thermal Power Generation, 48, 3, pp. 7-21, (2019)
  • [8] WANG Dongqing, LI Gang, HE Feiyue, Design of integrative information platform for smart substations, Power System Technology, 34, 10, pp. 20-25, (2010)
  • [9] YANG Yinhu, LUO Jianyong, WEI Yuantao, Et al., Development of distributed cable partial discharge online monitoring system, Smart Power, 46, 3, pp. 91-100, (2018)
  • [10] ZHANG Jinjiang, GUO Chuangxin, CAO Yijia, Design of embedded platform for substation data integration based on multi-agent system, Automation of Electric Power Systems, 32, 9, pp. 52-56, (2008)