Field measurements of long-span corrugated steel culvert replacing corroded concrete bridge

被引:0
|
作者
Vaslestad, Jan [1 ]
Madaj, Arkadiusz [2 ]
Janusz, Leszek [3 ]
机构
[1] ViaCon A/S, Strandveiven 3B, N-2005 Raelingen, Norway
[2] Poznan Institute of Technology, Civil Engineering Department, Ul, Piotrowo 5, Pl.-61-138 Poznan, Poland
[3] ViaCon Polska, Ul.Przemyslowa 6, PL-64-130 Rydzyna, Poland
关键词
Arches - Braking - Concrete bridges - Construction - Finite element method - Load testing - Locomotives - Mechanical variables measurement - Railroads - Soils - Steel pipe - Stress analysis;
D O I
10.3141/1814-19
中图分类号
学科分类号
摘要
Field measurements were carried out on a steel culvert in Poznan in Poland. The steel culvert is a pipe arch with a span of 8.9 m, a height of 7.76 m, and a soil cover of 1.8 m. This road culvert and a parallel pedestrian steel culvert were used to replace a severely corroded concrete railway bridge. The steel culverts were erected and backfilled without closing busy track railway. The steel culverts were instrumented to measure steel stress and deformations during backfilling and load testing. Two locomotives with a total weight of 2360 kN were used for load testing. The measured steel stress and displacements during load testing were recorded with the locomotives placed at various locations (static) and also during braking. The steel stress and deformations from live loading were small compared with the steel stress and deformations during backfilling. The measured steel stress from live loading was less than 7 MPa, and displacements were less than 0.5 mm. The measurements also show that long-span pipe arches perform well without longitudinal thrust beams and circumferential stiffening ribs. Long-term measurements were also taken in the period after the end of construction from March 1998 until December 2000 and indicated very good performance of the structure. The structure received a prize for engineering excellence due to innovative construction and aesthetic appearance.
引用
收藏
页码:164 / 170
相关论文
共 50 条
  • [21] Wind Field Numerical Simulation of Long-Span Bridge
    Guo, Jian
    Gan, Weichang
    Jiang, Dingyu
    Sun, Bingnan
    Peng, Wei
    SUSTAINABLE CITIES DEVELOPMENT AND ENVIRONMENT PROTECTION, PTS 1-3, 2013, 361-363 : 1094 - 1100
  • [22] CREEP CHARACTERISTICS OF CONCRETE USED IN LONG-SPAN ARCH BRIDGE
    Wang, Yongbao
    Zhao, Renda
    Jia, Yi
    Liao, Ping
    BALTIC JOURNAL OF ROAD AND BRIDGE ENGINEERING, 2019, 14 (01): : 18 - 36
  • [23] Vehicle-Bridge Coupling Vibration of Long-Span Concrete-Filled Steel Tubular Arch Bridge
    Yu, Peng
    Yu, Cun
    Ren, Zhaoyong
    Wang, Longlin
    INTERNATIONAL JOURNAL OF STRUCTURAL STABILITY AND DYNAMICS, 2025, 25 (06)
  • [24] Study of creep effects in a long-span concrete-filled steel tube arch bridge
    Zeng, Yong
    Zhong, Huadong
    Liu, Chengcai
    Tan, Hongmei
    Gu, An-bang
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-STRUCTURES AND BUILDINGS, 2018, 171 (08) : 642 - 658
  • [25] Seismic Behavior Analysis of a Long-Span PC Composite Box-girder Bridge with Corrugated Steel Webs
    Wang, Qiao
    Wan, Shui
    Li, Peifeng
    ADVANCES IN CIVIL AND STRUCTURAL ENGINEERING III, PTS 1-4, 2014, 501-504 : 1112 - +
  • [26] Mechanical Analysis for the Deck Pavement of Long-Span Steel Bridge
    Wu, Chunying
    Zhang, Zhixiang
    APPLIED MATERIALS AND ELECTRONICS ENGINEERING, PTS 1-2, 2012, 378-379 : 302 - 305
  • [27] Midwest guardrail system for long-span culvert applications
    Bielenberg, Robert W.
    Faller, Ronald K.
    Sicking, Dean L.
    Rohde, John R.
    Reid, John D.
    TRANSPORTATION RESEARCH RECORD, 2007, (2025) : 3 - 17
  • [28] Long-span bridge aerodynamics
    Ge, Yaojun
    Tanaka, Hiroshi
    Advanced Structural Wind Engineering, 2013, : 85 - 120
  • [29] Vehicle-bridge coupling vibration analysis of long-span concrete-filled steel tubular arch bridge
    Yao, Dunrong
    Deng, Nianchun
    Journal of Railway Science and Engineering, 2022, 19 (12) : 3693 - 3704
  • [30] Nonlinear Stability Analysis on the concrete casting step of Long-span Concrete-filled Steel Tube Arch Bridge
    Wang Ji
    Zhang Ming-zhong
    Guo Xiao-li
    ADVANCED MATERIALS SCIENCE AND TECHNOLOGY, 2009, 614 : 275 - 281