共 10 条
- [1] Certain features of the operation of power unit no. 1 of the Rostov NPS under variable operating regimes Teploenergetika, 2003, (05): : 9 - 10
- [2] Experience of Starting and Adjustment Work and Initial Period of Operation of No. 5 Unit of Novovoronezhskaya Nuclear Power Plant. Teploenergetika, 1982, (07): : 8 - 12
- [3] EXPERIENCE FROM OPERATION OF OSKARSHAMN UNIT NO. 1. 1600, Int At Energy Agency (Proc Ser, STI/PUB/351), Vienna, Austria
- [6] Design, Layout and Operation of the DENOX Plant at Altbach/Deizisau Power Station, Unit No. 5, and Operating Experience. VGB-Kraftwerkstechnik, 1987, 67 (04): : 368 - 377
- [8] Metrological tests of the measuring channels of the automatic process control system for power unit no. 1 of TETs-27 of AO Mosenergo Teploenergetika, 2002, (03): : 54 - 61
- [9] Design and operation experience of most advanced combined cycle plant - construction of Unit No.4-1 Higashi Niigata Thermal Power Station of Tohoku Electric Power Co., Inc. Technical Review - Mitsubishi Heavy Industries, 2000, 37 (03): : 69 - 73
- [10] Development of a measuring technique based on JET second D-T campaign (DTE2) experience for assessing fusion power at ITER during D-T operation using the radial gamma-ray spectrometer REVIEW OF SCIENTIFIC INSTRUMENTS, 2024, 95 (08):