Major causes of construction time and cost overruns: A case of selected educational sector projects in Ghana

被引:94
作者
Famiyeh S. [1 ]
Amoatey C.T. [1 ]
Adaku E. [1 ]
Agbenohevi C.S. [2 ]
机构
[1] Business School, Ghana Institute of Management and Public Administration, Accra
[2] Procurement and Project Management Consultancy Limited, Accra
关键词
Construction; Cost; Ghana; Project; Time;
D O I
10.1108/JEDT-11-2015-0075
中图分类号
学科分类号
摘要
Purpose: In Ghana, the duration of construction projects from inception to completion is becoming a great concern, recently, especially among clients and beneficiaries, because of the rising interest rates, inflation, development plan targets, among other factors. Hence the need to understand the causes of delays and cost overrun in the construction sector has become more important than ever. This study therefore aims to identify the major factors underlying time and cost overruns in projects related to the education sector in Ghana to proffer practical solutions in addressing them. Design/methodology/approach: The study conducted a survey among clients’ consultants and representatives of the contractors working on about 60 government school projects. A relative importance index was used to determine the relative effects of the factors causing construction time and cost overruns. Findings: The key factors causing construction time overrun were: financial problems, unrealistic contract durations imposed by clients, poorly defined project scope, client-initiated variations, under-estimation of project cost by consultants, poor inspection/supervision of projects by consultants. Other factors were underestimation of project complexity by contractors, poor site management, inappropriate construction methods used by contractors and delays in the issuance of permits by government agencies. Factors affecting cost overruns were financial difficulty by client, delays in payments of completed works, variations in designs, lack of communications plans, poor feasibility and project analysis, poor financial management on site and material price fluctuations. Research limitations/implications: The research was limited to only the educational sector projects. Practical implications: Practically, this study highlights for the construction sector the critical factors causing project time and cost overruns in Ghana. Identification of these factors provides the basis for pragmatic solutions to enhance the chances of project success. Social implications: The identification and solutions to project time and cost overruns, especially for educational sector projects, contribute toward making public goods more affordable and accessible to most citizens, particularly in developing countries. Originality/value: This study contributes to the debate on factors causing project time and cost overruns in the construction sector especially from a developing country’s perspective. © 2017, © Emerald Publishing Limited.
引用
收藏
页码:181 / 198
页数:17
相关论文
共 71 条
[1]  
Agyakwa-Baah A., Stakeholders’ perception of the causes of delay on construction projects, (2007)
[2]  
Agyakwa-Baah A., A study into risk assessment and management practices within ghanaian medium and large construction organizations, (2009)
[3]  
Ahmed S., Azher S., Castillo M., Kappagantula P., Construction Delays in Florida
[4]  
An Empirical Study, (2002)
[5]  
Aibinu A.A., Jagboro G.O., The effects of construction delays on project delivery in Nigerian construction industry, International Journal of Project Management, 20, 8, pp. 593-599, (2002)
[6]  
Aibinu A.A., Odeyinka H.A., Construction delays and their causative factors in Nigeria, Journal of Construction Engineering and Management, 132, 7, pp. 667-677, (2006)
[7]  
Alaghbari M., Razali A., Khadir S., Ernawati, The significant factors causing delay of building construction projects in Malaysia, Journal of Engineering, Construction and Architectural Management, 14, pp. 192-206, (2007)
[8]  
Alkass S., Harris F., Construction contractor’s claims analysis: an integrated system approach, Building Research & Information, 19, 1, (1991)
[9]  
Al-Khalil M., Al-Gafly M.A., Important causes of delay in public utility projects in Saudi Arabia, Journal of Construction Management and Economics, 17, 5, pp. 647-655, (1999)
[10]  
Al-Moumani H.A., Construction delay: a quantitative analyses, International Journal of Project Management, 18, 1, pp. 51-59, (2000)