共 12 条
- [1] Salveson M E., The assembly line balancing problem, Journal of Industrial Engineering, 29, 10, pp. 55-101, (1955)
- [2] Zhou Bing-hai, Peng Tao, Optimal schedule of just-in-time part distribution for mix-model assembly lines, Journal of Jilin University(Engineering and Technology Edition), 47, 4, pp. 1253-1261, (2017)
- [3] Moodie C L, Young H H., A heuristic method of assembly line balancing for assumptions of constant or variable work element times, Journal of Industrial Engineering, 16, 1, pp. 23-29, (1965)
- [4] Miltenburg G J, Wijngaard J., The U-line line balancing problem, Management Science, 40, 10, pp. 1378-1388, (1994)
- [5] Gokcen H, Agpak K, Benzer R., Balancing of parallel assembly lines, International Journal of Production Economics, 103, 2, pp. 600-609, (2006)
- [6] Aydogan E K, Delice Y, Ozcan U, Et al., Balancing stochastic U-lines using particle swarm optimization, Journal of Intelligent Manufacturing, 30, pp. 97-111, (2016)
- [7] Oksuz M K, Buyukozkan K, Satoglu S I., U-shaped assembly line worker assignment and balancing problem: a mathematical model and two meta-heuristics, Computers & Industrial Engineering, 112, pp. 246-263, (2017)
- [8] Ozcan U., Balancing stochastic parallel assembly lines, Computers & Operations Research, 99, pp. 109-122, (2018)
- [9] Kucukkoc I, Zhang D Z., Balancing of parallel U-shaped assembly lines, Computers & Operations Research, 64, pp. 233-244, (2015)
- [10] Jiao Yu-ling, Xu Liang-cheng, Wang Zhan-zhong, Et al., Balance experiment and analysis of double U-shaped assembly line based on directed network, Journal of Jilin University(Engineering and Technology Edition), 48, 2, pp. 454-459, (2018)