共 11 条
[1]
Cao Z., Zhu Y., Li F., Research on dynamic planning & simulation optimization of mixed model general automobile assembly lines, Computer Integrated Manufacturing Systems, 12, 4, pp. 526-532, (2006)
[2]
Peng S., Guo D., Zhang P., The study of the flexible assembly system design, China Mechanical Engineering, 7, 3, pp. 37-40, (1996)
[3]
Zhang B., Liu Y., Dynamic scheduling of stochastic operation schemes, Journal of South China University of Technology: Natural Science Edition, 28, 1, pp. 122-129, (2000)
[4]
Jia D., Wang H., Simulation modeling for stochastic assembly line balancing, Journal of Industrial Engineering and Engineering Management, 8, 4, pp. 232-237, (1994)
[5]
Zhao X., Liu J., Ohno K., Et al., Modeling and analysis of a mixed-model assembly line with stochastic operation times, Naval Research Logistics, 54, 6, pp. 681-691, (2007)
[6]
Deng F., Ant colony optimization for solving the assembly line balancing problem, (2011)
[7]
Sarin S.C., Erel E., Dar-El E.M., A methodology for solving single-model, stochastic assembly line balancing problem, The International Journal of Management Science, 27, 5, pp. 525-535, (1999)
[8]
Gokcen H., Baykoc O.F., A new line remedial policy for the paced lines with stochastic task times, The International Journal of Production Economics, 58, 2, pp. 191-197, (1999)
[9]
Siewmun H., Continuous processes can be lean(lean manufacturing and six sigma for continuous process manufacturing), Manufacturing Engineering, 138, 6, pp. 103-109, (2007)
[10]
Kottas J.F., Lau H.S., A stochastic line balancing procedure, International Journal of Production Research, 19, 2, pp. 177-193, (1981)