Fitness landscapes of buffer allocation problem for production lines with unreliable machines

被引:5
作者
Dolgui, Alexandre [1 ]
Eremeev, Anton, V [2 ]
Sigaev, Vyatcheslav S. [3 ]
机构
[1] IMT Atlantique, LS2N CNRS, Nantes, France
[2] Sobolev Inst Math, Omsk Dept, Omsk, Russia
[3] Avtomatika Serv LLC, Omsk, Russia
基金
俄罗斯科学基金会;
关键词
Production line; Series-parallel structure; Unreliable machines; Buffer allocation; Genetic algorithms; Local optima; SPACE; OPTIMIZATION; EFFICIENCY;
D O I
10.1016/j.cor.2024.106819
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
We study the structural properties of the buffer allocation problem from the fitness landscape perspective. We consider manufacturing flow lines with series-parallel network structure. The machines are supposed to be unreliable, their time to failure and repair time are exponentially distributed. Tentative solutions are evaluated by means of an approximate method based on the Markov models aggregation. We carry out computational experiments with local search and genetic algorithms in order to evaluate the fitness landscape properties of previously published instances and their modifications. It turns out that the so-called 'massif central' or 'big valley' structure of the fitness landscape is present but only partially: The fitness of local optima is negatively correlated with the distance to the best found solution, yet the set of local optima cannot be encompassed by a ball of relatively small size with respect to the size of solution space. Moreover, we show that in many problem instances, several clusters of local optima can be identified. The performance of genetic algorithms is discussed with respect to population clustering and the permanent usage of crossover is recommended.
引用
收藏
页数:12
相关论文
共 65 条
  • [1] Alaouchiche Y., Ouazene Y., Yalaoui F., A fast and efficient analytical method for throughput evaluation of unreliable series-parallel production lines, Journal of Industrial and Management Optimization, 19, 8, pp. 6082-6103, (2023)
  • [2] Alfieri A., Matta A., Pastore E., The time buffer approximated buffer allocation problem: A row–column generation approach, Comput. Oper. Res., 115, (2020)
  • [3] Ancelin B., Semery A., Calcul de la productivité d'une ligne integrée de fabrication, RAIRO-Autom. Prod. Inf., 21, pp. 209-238, (1987)
  • [4] Biller S., Li J., Marin S., Meerkov S., Zhang L., Bottlenecks in Bernoulli serial lines with rework, IEEE Trans. Autom. Sci. Eng., 7, pp. 208-217, (2010)
  • [5] Boese K., Kahng A., Muddu S., (1993)
  • [6] Buzacott J.A., Shantikumar J.G., Stochastic Models of Manufacturing Systems, (1993)
  • [7] Chen C.-H., Lee L.H., Stochastic Simulation Optimization, (2011)
  • [8] Coillard P., Proth J., Effet des stocks tampons dans une fabrication en ligne, Rev. Belge Statist. d'Inf. Rec. Opé., 24, 2, pp. 3-27, (1984)
  • [9] Dallery Y., David R., Xie X., An efficient algorithm for analysis of transfer lines with unreliable machines and finite buffers, IIE Trans., 20, pp. 280-283, (1988)
  • [10] Dallery Y., David R., Xie X., Approximate analysis of transfer lines with unreliable machines and finite buffers, IEEE Trans. Autom. Control, 34, pp. 943-953, (1989)