Risk control for saturated hyperbaric intervention in slurry shield tunnelling

被引:0
作者
Zhang, Boyang [1 ]
Zhao, Xiaopeng [1 ]
Zhang, Yaguo [2 ]
Chen, Yu [1 ]
机构
[1] CCCC Tunnel Engineering Co. Ltd., Beijing
[2] CCCC Nanjing Weisan Road River-Crossing Tunnel Construction Headquarters, Nanjing
关键词
Risk analysis; Saturated hyperbaric intervention; Slurry shield; Tunnel;
D O I
10.13807/j.cnki.mtt.2015.04.008
中图分类号
学科分类号
摘要
Saturated hyperbaric intervention technology has the advantages of high efficiency and security, but it also has many risks. Based on the Nanjing Weisan Road river-crossing tunnel project, the technological process of saturated hyperbaric intervention is introduced in detail, and the risks concerning geology, unstable pressure on the tunnel face, physical effects and equipment failure are analyzed, with corresponding countermeasures given. The practices show that these risks in the process of saturated hyperbaric intervention are controllable and suitable solutions can be made according to various existing risks and engineering features. ©, 2015, Editorial Office of Modern Tunnelling Technology". All right reserved."
引用
收藏
页码:55 / 61
页数:6
相关论文
共 8 条
[1]  
Shi S., Hyperbaric Intervention of an Earth Pressure Balance Shield in Water-Rich Sand Stratum, Modern Tunnelling Technology, 50, 1, pp. 54-60, (2013)
[2]  
Chen K., Technologies for Replacing Cutting Tools in Shield Tunnelling under Ultra-high Water Pressure, Tunnel Construction, 8, 8, pp. 625-631, (2013)
[3]  
Zhu W., Min F., Yao Z., Et al., Technical Status and Case Study on Intervention in the Shield Chamber, Modern Tunnelling Technology, 52, 1, pp. 9-18, (2015)
[4]  
Fu C., Slurry Shield Pressure Brought into Warehouse Operation Safety Technical Measures, Construction Mechanization, 6, pp. 85-87, (2013)
[5]  
Luo Z., Hu Z., Risk Analysis of and Preventive Measures for Operation in a Shield Chamber in Mixed Ground, Modern Tunnelling Technology, 49, 2, pp. 45-53, (2012)
[6]  
Wu Z., Zhong X., Yang Z., Yang Q., Calculation of the Minimum Excavation Face Support Pressure for Opening Chamber in Slurry Shield in Nanjing Weishan Road River Tunnel, China Harbour Engineering, 2, pp. 33-36, (2014)
[7]  
Miao Z., Huang L., Techniques for Cutter Changing in a Pressurized Chamber of an NFM EPB Shield, Modern Tunnelling Technology, 49, 2, pp. 99-103, (2012)
[8]  
Guo X., Min F., Zhong X., Et al., Summaries of Key Technologies and Difficulties in Nanjing Yangtze River Tunnel Project, Chinese Journal of Rock Mechanics and Engineering, 31, 10, pp. 2154-2160, (2012)