Two-stage procedure for deterministic single-machine scheduling problem

被引:0
|
作者
机构
[1] Wang, Bing
来源
Wang, B. (wangbing@sdu.edu.cn) | 2005年 / Editorial Office of Chinese Journal of Mechanical Engineering卷 / 41期
关键词
Scheduling;
D O I
10.3901/jme.2005.09.128
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [1] A branch-and-bound procedure for a single-machine earliness scheduling problem with two agents
    Yin, Yunqiang
    Wu, Chin-Chia
    Wu, Wen-Hsiang
    Hsu, Chou-Jung
    Wu, Wen-Hung
    APPLIED SOFT COMPUTING, 2013, 13 (02) : 1042 - 1054
  • [2] DETERMINISTIC DEMAND MULTI-PRODUCT SINGLE-MACHINE LOT SCHEDULING PROBLEM
    GRAVES, SC
    MANAGEMENT SCIENCE, 1979, 25 (03) : 276 - 280
  • [3] ITERATIVE PROCEDURE FOR SINGLE-MACHINE MULTI-PRODUCT LOT SCHEDULING PROBLEM
    DOLL, CL
    WHYBARK, DC
    MANAGEMENT SCIENCE SERIES A-THEORY, 1973, 20 (01): : 50 - 55
  • [4] A 2-STAGE TRAVELING-SALESMAN PROCEDURE FOR THE SINGLE-MACHINE SEQUENCE-DEPENDENT SCHEDULING PROBLEM
    OZGUR, CO
    BROWN, JR
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1995, 23 (02): : 205 - 219
  • [5] A Robust Single-Machine Scheduling Problem with Two Job Parameter Scenarios
    Xuan, Gang
    Lin, Win-Chin
    Cheng, Shuenn-Ren
    Shen, Wei-Lun
    Pan, Po-An
    Kuo, Chih-Ling
    Wu, Chin-Chia
    MATHEMATICS, 2022, 10 (13)
  • [6] Solving a two-agent single-machine learning scheduling problem
    Wu, Wen-Hung
    INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2014, 27 (01) : 20 - 35
  • [7] A single-machine bi-criterion scheduling problem with two agents
    Lee, Wen-Chiung
    Chung, Yu-Hsiang
    Huang, Zong-Ren
    APPLIED MATHEMATICS AND COMPUTATION, 2013, 219 (23) : 10831 - 10841
  • [8] A single-machine scheduling problem with two-agent and deteriorating jobs
    Lee, Wen-Chiung
    Wang, Wei-Jhe
    Shiau, Yau-Ren
    Wu, Chin-Chia
    APPLIED MATHEMATICAL MODELLING, 2010, 34 (10) : 3098 - 3107
  • [9] A SINGLE-MACHINE TWO-AGENT SCHEDULING PROBLEM BY GA APPROACH
    Cheng, Shuenn-Ren
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2012, 29 (02)
  • [10] ON THE SINGLE-MACHINE SCHEDULING PROBLEM WITH TARDINESS PENALTIES
    SEN, T
    BORAH, BN
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1991, 42 (08) : 695 - 702