共 50 条
- [31] Strength calculations of block elements of room-and-pillar mining under permafrost conditions NEW TECHNIQUES AND TECHNOLOGIES IN MINING, 2010, : 47 - 50
- [32] CONTRIBUTION OF NUMERICAL STRESS-ANALYSIS TO THE ROOM-AND-PILLAR DESIGN OF A PRODUCING GOLD MINE - A CASE-STUDY PROCEEDINGS : 1989 MULTINATIONAL CONFERENCE ON MINE PLANNING AND DESIGN, 1989, : 33 - 40
- [33] Technological and Geomechanical Parameters of Room-and-Pillar System of Mining a Thick Flat Seam Journal of Mining Science, 2001, 37 : 472 - 474
- [34] A method for analyzing and designing frictional rock bolting systems in room-and-pillar mining MINE PLANNING AND EQUIPMENT SELECTION 2000, 2000, : 349 - 353
- [35] APPLICATION OF WORKSTATION SOFTWARE TO NUMERICAL MODELING OF ROOM-AND-PILLAR COAL-MINING TRANSACTIONS OF THE INSTITUTION OF MINING AND METALLURGY SECTION A-MINING INDUSTRY, 1992, 101 : A89 - A94
- [37] Mechanism of disaster induced by dynamic instability of coal pillar group in room-and-pillar mining of shallow and close coal seams Meitan Xuebao/Journal of the China Coal Society, 2019, 44 (02): : 358 - 366
- [38] Research and application of separate room-and-pillar method in Liaoyang Gypsum Mine I group Liaoning Gongcheng Jishu Daxue Xuebao (Ziran Kexue Ban)/Journal of Liaoning Technical University (Natural Science Edition), 2007, 26 (SUPPL. 2): : 28 - 30
- [39] Geomechanical safety aspects in hard rocks mining based on room-and-pillar and longwall mining systems MINEFILL 2020-2021, 2021, : 288 - 304
- [40] Optimality Analysis of Pillar Dimensions in Room and Pillar Mining PROCEEDINGS OF THE 4TH INTERNATIONAL SYMPOSIUM ON MINE SAFETY (2012), 2012, : 85 - 87