Joint optimal PMU and DULR placement in distribution network considering fault reconstruction and state estimation accuracy

被引:0
作者
Wu, Zhi [1 ]
Jiang, Jiachen [1 ]
Zheng, Shu [1 ]
Zhao, Jingtao [2 ]
Gu, Wei [1 ]
机构
[1] Southeast Univ, Sch Elect Engn, Nanjing 210096, Peoples R China
[2] State Grid Elect Power Res Inst, Nanjing 211102, Peoples R China
关键词
Phasor measurement unit (PMU); Distribution network (DN); State estimation (SE); Optimal placement problem (OPP); Fault reconstruction; BAD DATA DETECTION; DISTRIBUTION-SYSTEMS; OBSERVABILITY; FORMULATION;
D O I
10.1016/j.ijepes.2024.110320
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Due to the rapid development of the distribution network, there is an urgent need for high-precision state estimation and safe and stable operation, this paper proposes a joint optimal placement method for Phasor Measurement Unit (PMU) and Dual Use Line Relay (DULR) in distribution networks considering fault reconstruction and state estimation accuracy. The proposed method aims to minimize the cost of PMU and DULR configuration. Based on the known pseudo-measurements and Supervisory Control and Data Acquisition (SCADA) measurements, we use the E-optimal standard design of the state estimation error covariance matrix to form the state estimation accuracy index and take the relay protection function of Feeder Terminal Unit (FTU) device and DULR device into consideration of the fault reconstruction. By solving the mixed integer semidefinite programming (MISDP) model, the optimal placement result is obtained, so that the network under normal condition and the network after multiple fault reconstruction can meet the constraints of state estimation accuracy and load loss rate respectively. The proposed method is tested on IEEE 33-node, 123-node systems as an example. The experimental results show that the proposed method is effective and practical. Note to Practitioners-This study is stimulated by the need for optimizing the placement of Micro-PMU (mu PMU) in distribution network. Since the new mu PMU device DULR has the same relay protection function as FTU, and distributed generation can supply power to the island after failure, this paper adds the load loss rate to the constraint conditions to study the influence of fault reconstruction on the placement scheme. A new two-step SE method considering mixed measurements was used in this paper to improve the computational efficiency of real-time SE of large-scale system while ensuring the accuracy of the calculation results. We have conducted tests in IEEE-33 and IEEE-123 systems. After preliminary verification, compared with the single fault scenario, we find that the placement scheme considering multiple fault scenarios can effectively improve the accuracy of state estimation and reduce the load loss rate of each fault scenario and only increase the cost a little. The increase in the number of DG and contact lines in the network will also effectively improve the feasibility of the placement scheme. The increase of the number of FTU configurations can effectively reduce the configuration of DULR by adding a small amount of mu PMU, reduce the total cost as a result. In future studies, we will further consider the integrated configuration of mu PMU, DULR and FTU, to meet more failure scenarios while reducing costs.
引用
收藏
页数:9
相关论文
共 39 条
[1]   Optimal Micro-PMU Placement in Distribution Networks Considering Usable Zero-Injection Phase Strings [J].
Anguswamy, Manoj Prabhakar ;
Datta, Manoj ;
Meegahapola, Lasantha ;
Vahidnia, Arash .
IEEE TRANSACTIONS ON SMART GRID, 2022, 13 (05) :3662-3675
[2]   Optimal PMU placement for power system observability considering network expansion and N-1 contingencies [J].
Asgari, Abdolrahim ;
Firouzjah, Khalil Gorgani .
IET GENERATION TRANSMISSION & DISTRIBUTION, 2018, 12 (18) :4216-4224
[3]   An Approach to Unravel the Optimal PMU Placement Problem for Full Observability of Power Network in View of Contingencies [J].
Babu, Rohit ;
Gupta, Vikash Kumar ;
Subbaramaiah, Kanna .
INTERNATIONAL JOURNAL OF SYSTEM ASSURANCE ENGINEERING AND MANAGEMENT, 2022, 13 (03) :1170-1186
[4]  
Chatterjee S, 2017, 2017 14 IEEE IND COU, P1
[5]   Fast Identification of Symmetrical or Asymmetrical Faults During Power Swings with Dual Use Line Relays [J].
Chatterjee, Soumesh ;
Roy, Biman Kumar Saha .
CSEE JOURNAL OF POWER AND ENERGY SYSTEMS, 2020, 6 (01) :184-192
[6]   Placement of PMUs to enable bad data detection in state estimation [J].
Chen, Jian ;
Abur, Ali .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2006, 21 (04) :1608-1615
[7]  
De Oliveira-De Jesus PM, 2020, Int Trans Electr Energ Syst, V30
[8]   A New Model for Resilient Distribution Systems by Microgrids Formation [J].
Ding, Tao ;
Lin, Yanling ;
Li, Gengfeng ;
Bie, Zhaohong .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2017, 32 (05) :4145-4147
[9]   Deploying Micro-PMUs With Channel Limit in Reconfigurable Distribution Systems [J].
Dua, Gagandeep Singh ;
Tyagi, Barjeev ;
Kumar, Vishal .
IEEE SYSTEMS JOURNAL, 2022, 16 (01) :832-843
[10]   Reliability Analysis of Substation Monitoring Systems Based on Branch PMUs [J].
Gomez, Oscar ;
Portilla, Cesar ;
Rios, Mario A. .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2015, 30 (02) :962-969