Application of new biological nitrogen removal technologies in full-scale treatment of landfill leachate

被引:0
|
作者
Guangdong Institute of Microbiology, Guangzhou 510070, China [1 ]
不详 [2 ]
机构
来源
Huanjing Kexue | 2007年 / 3卷 / 607-612期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
In order to improve the treatment efficiency of the high concentration of ammonium nitrogen in landfill leachate, anaerobic baffled reactor (ABR) and hybrid biofilm reactor (HBR) were introduced to the full-scale treatment of Datianshang landfill leachate. The efficiencies of nitrogen removal and the status of microorganism of the two biological treatment processes were analyzed. To achieve ANAMMOX and partial nitration process, the concentration of dissolved oxygen in HBR was controlled and the effluent of HBR was recycled to the inlet of the ABR in a large proportion. The full-scale operation results showed that when the concentration of influent ammonium nitrogen was at 336.24~685.09 mg/L, the anaerobic granule sludge and the ANAMMOX bacteria were observed and the average ammonium nitrogen removal rate reached 34.9% in ABR after the start-up period of 60 days. The population of ammonium oxidizing bacteria and the average ammonium nitrogen removal rate in HBR reached 6.4 x 107 cells/mL and 95.1%, respectively, after 30 days of ABR stable running process. The final effluent ammonium nitrogen concentration was under 25 mg/L and the removal rate of total nitrogen was above 80% after the ABR-HBR combined processes treatment. It was suggested that using of advance environmental biotechnology to improve the capacity of the conventional leachate treatment plant was advisable, especially for those low efficiency facilities working improperly.
引用
收藏
页码:607 / 612
相关论文
共 50 条
  • [41] Application of machine learning techniques to model a full-scale wastewater treatment plant with biological nutrient removal
    Zaghloul, Mohamed Sherif
    Achari, Gopal
    JOURNAL OF ENVIRONMENTAL CHEMICAL ENGINEERING, 2022, 10 (03):
  • [42] Molecular Biomarkers and Influential Factors of Denitrification in a Full-Scale Biological Nitrogen Removal Plant
    Fang, Hua
    Olson, Betty H.
    Asvapathanagul, Pitiporn
    Wang, Tongzhou
    Tsai, Raymond
    Rosso, Diego
    MICROORGANISMS, 2020, 8 (01)
  • [43] Identification and quantitative evaluation of nitrogen-converting organisms in a full-scale leachate treatment plant
    Yapsakli, Kozet
    Aliyazicioglu, Cigdem
    Mertoglu, Bulent
    JOURNAL OF ENVIRONMENTAL MANAGEMENT, 2011, 92 (03) : 714 - 723
  • [44] Characteristics and key driving factors of nitrous oxide emissions from a full-scale landfill leachate treatment system
    Zhang, Bo
    Mao, Wenlong
    Chen, Shaohua
    Wang, Xiaojun
    SCIENCE OF THE TOTAL ENVIRONMENT, 2024, 931
  • [45] Revamping of a Full-Scale Membrane Plant for Landfill Leachate Pretreatment Using Partial Nitritation
    Palli, Laura
    Tuci, Francesca
    La Franca, Letizia Macellaro
    Fibbi, Donatella
    Gori, Riccardo
    MEMBRANES, 2024, 14 (05)
  • [46] Optimization of a full-scale Unitank wastewater treatment plant for biological phosphorus removal
    Zhou, Zhen
    Xing, Can
    Wu, Zhichao
    Tong, Fei
    Wang, Junru
    ENVIRONMENTAL TECHNOLOGY, 2014, 35 (06) : 766 - 772
  • [47] Emerging pollutants removal in full-scale biological treatment plants: A case study
    Ulucan-Altuntas, Kubra
    Manav-Demir, Neslihan
    Ilhan, Fatih
    Gelgor, Huseyin Baran
    Huddersman, Katherine
    Tiwary, Abhishek
    Debik, Eyup
    JOURNAL OF WATER PROCESS ENGINEERING, 2023, 51
  • [48] Biological Phosphorus Removal Characteristics in a Full-scale Unitank Wastewater Treatment Plant
    Zhou, Zhen
    Shao, Wenrui
    Xing, Can
    Li, Zheng
    Guan, Pengqiong
    Zhou, Tao
    Wei, Zichao
    PROGRESS IN ENVIRONMENTAL SCIENCE AND ENGINEERING, PTS 1-4, 2013, 610-613 : 1696 - 1700
  • [49] Best Operative Practices for the Management of full Scale Biological Reactor for non Hazardous Landfill Leachate Treatment
    Laura Eusebi, Anna
    Romero, Pablo
    Battistoni, Paolo
    ICHEAP12: 12TH INTERNATIONAL CONFERENCE ON CHEMICAL & PROCESS ENGINEERING, 2015, 43 : 1885 - 1890
  • [50] OPERATION OF FULL-SCALE BIOLOGICAL PHOSPHORUS REMOVAL PLANT
    LEVIN, GV
    TOPOL, GJ
    TARNAY, AG
    JOURNAL WATER POLLUTION CONTROL FEDERATION, 1975, 47 (03): : 577 - 590