Fluid-solid interaction-based mechanical characteristics of underwater shield tunnel

被引:0
作者
Qi, Chun [1 ]
He, Chuan [1 ]
Feng, Kun [1 ]
机构
[1] MOE Key Laboratory of Transportation Tunnel Engineering, Southwest Jiaotong University, Chengdu
来源
Xinan Jiaotong Daxue Xuebao/Journal of Southwest Jiaotong University | 2015年 / 50卷 / 02期
关键词
Construction stage; Field test; Fluid-solid interaction; Spring-beam model; Underwater shield tunnel;
D O I
10.3969/j.issn.0258-2724.2015.02.015
中图分类号
学科分类号
摘要
In order to investigate the mechanical characteristics of a underwater shield tunnel under fluid-solid interaction during construction stage, a numerical simulation model was established to calculate water pressure on segment lining by taking Shiziyang shield tunnel as an example. Field tests were carried out to measure external and internal loads acting on segment lining structure. The calculated water pressure was acted on the spring-beam model to analyze structural internal forces, and mechanical characteristics of a segment structure under fluid-solid interaction during construction stage were obtained. The research result shows that water pressure fluctuates obviously to the first 3 to 5 rings after the target segment ring lefts the shield tail owing to grouting pressure. When the number of left-shield-tail rings comes to 10 or more, the water pressure gets close to hydrostatic pressure with the dissertation of grouting pressure and the vanishing of fluid-solid interaction. ©, 2015, Science Press. All right reserved.
引用
收藏
页码:306 / 311and330
相关论文
共 10 条
[1]  
Wang M., Design and construction technology of underwater tunnel, Engineering Science, 11, 7, pp. 4-10, (2009)
[2]  
He C., Wang B., Research progress and development trends of highway tunnels in China, Journal of Modern Transportation, 21, 4, pp. 209-223, (2013)
[3]  
He C., Feng K., Review and prospect of structure research of underwater shield tunnel with large cross-section, Journal of Southwest Jiaotong University, 46, 1, pp. 1-11, (2011)
[4]  
Abu-Farsakh M.Y., Voyiadjis G.Z., Computational model for the simulation of the shield tunneling process in cohesive soils, International Journal for Numerical and Analytical Methods in Geomechanics, 23, 1, pp. 23-44, (1999)
[5]  
Li P., Zhang D., Li B., Et al., Coupled fluid-solid analysis of the surrounding rock stability of the subsea tunnel during construction process, China Railway Science, 31, 3, pp. 35-41, (2010)
[6]  
Li D., Li X., Zhang W., Et al., Stability analysis of surrounding rock of multi-arch tunnel based on coupled fluid-solid theorem, Chinese Journal of Rock Mechanics and Engineering, 26, 5, pp. 1056-1064, (2007)
[7]  
Zhou J., He C., Fang Y., Et al., Mechanical property testing and back analysis of load models of metro shield tunnel lining in loess strata, Rock and Soil Mechanics, 32, 1, pp. 165-171, (2011)
[8]  
Zhou J., He C., Xiao M., Et al., Field test and numerical simulation of mechanics of segment lining of Shiziyang underwater shield tunnel, Journal of the China Railway Society, 34, 7, pp. 115-121, (2012)
[9]  
Zhong X., Zhu W., Qin J., The comparison of shield tunnel with segment seams in sequence and in stagger, Chinese Journal of Geotechnical Engineering, 25, 1, pp. 109-112, (2003)
[10]  
Zhang J., He C., Yang Z., Analysis of 3D internal forces distribution of wide segment lining for large-section shield tunnel, Rock and Soil Mechanics, 30, 7, pp. 2058-2062, (2009)