Contractor-led quality control and quality assurance plus design-build: Who is watching the quality?

被引:0
|
作者
Ernzen, Jim [1 ]
Feeney, Tom [1 ]
机构
[1] Del E. Webb School of Construction, Arizona State University, Box 870204, Tempe, AZ 85287-0204, United States
关键词
Compressive strength - Contracts - Highway engineering - Quality assurance;
D O I
10.3141/1813-31
中图分类号
学科分类号
摘要
Recent innovations by the Arizona Department of Transportation (DOT) in the use of design-build procurement for highway construction are presented. Explosive population growth in Arizona has pushed its DOT to the limits of its capacity and has challenged the department to develop innovative ways to stretch its resources to meet its constituents' needs. In 1996 the department spearheaded the passage of a pilot design-build law aimed at completing public-sector construction projects more rapidly than could be done by traditional methods. An evaluation of the material quality program used in the second design-build project in this program is described. The project reconstructed an extremely congested 7-mi segment of Interstate 17, a primary artery carrying 180,000 vehicles per day through the city of Phoenix, widening it from 6 to 10 lanes. The design-build contract was awarded after A+B bidding, which considered the bid price to do the work and the time required to complete the project, and was the largest ever awarded at the time. It was won by a design-builder who implemented a very aggressive schedule that required double-shift work for nearly 2 years. In another contracting first, the agency also assigned the design-builder responsibility for the quality control and quality assurance functions on the project, with Arizona DOT providing verification sampling and testing only. The concrete compressive strength and material density for the project are examined and are compared to statewide averages for traditional design-bid-build projects in which Arizona DOT performed the quality assurance function. Analysis of the data shows that despite a highly compressed schedule, the quality of the material on the project exceeded the project specifications and was similar to the quality of work completed for the state under traditional contracting methods with an Arizona DOT-operated quality assurance program.
引用
收藏
页码:253 / 259
相关论文
共 50 条
  • [1] Contractor-led quality control and quality assurance plus design-build - Who is watching the quality?
    Ernzen, J
    Feeney, T
    CONSTRUCTION 2002: MATERIALS AND CONSTRUCTION, 2002, (1813): : 253 - 259
  • [2] Contractor-led public relations on a design-build highway project
    Ernzen, J
    Woods, J
    LAND DEVELOPMENT AND PUBLIC INVOLVEMENT IN TRANSPORTATION: PLANNING AND ADMINISTRATION, 2001, (1780): : 155 - 164
  • [3] Identifying Gaps in the Understanding of a Quality Assurance Program in Design-Build Quality Management
    Liu, Lier
    Hyun Lee, Jung
    Ashuri, Baabak
    JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2022, 14 (03)
  • [4] Development of quality index for design-build transportation projects
    Adamtey, Simon Asinor
    INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2019, 14 (02) : 147 - 154
  • [5] Design Quality Audits: A Design-Build Claims Avoidance Tool
    Kocot, Bridget
    Gransberg, Douglas D.
    Tapia, Ricardo M.
    JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2024, 16 (01)
  • [6] Quality performance in a design-build mega-project
    Collier, P
    Corbett, M
    Lundrigan, B
    ASQ'S 55TH ANNUAL QUALITY CONGRESS PROCEEDINGS, 2001, : 17 - 26
  • [7] Optimizing Quality Control and Assurance of Design-Build Transportation Projects through Alignment of RFP Selection Criteria with Owners Expectations
    Moran, Raymond M.
    Odeh, Ibrahim
    Ashuri, Baabak
    JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2024, 16 (02)
  • [8] Quality control and quality assurance in building design and construction
    Department of Architecture, Guru Nanak Dev University, Amritsar 143005
    J Inst Eng India: Archit Eng Div, 2007, OCT. (16-20): : 16 - 20
  • [9] Comparing the Performance Quality of Design-Bid-Build and Design-Build Delivery Methods
    Yu, Tao
    Shen, Geoffrey Qiping
    Shi, Qian
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2017, 143 (04)
  • [10] Trends in Quality Management Approaches to Design-Build Transportation Projects
    Gad, Ghada M.
    Adamtey, Simon A.
    Gransberg, Douglas D.
    TRANSPORTATION RESEARCH RECORD, 2015, (2504) : 87 - 92