Project risk management practice: The case of a South African utility company

被引:22
|
作者
van Wyk, Riaan [1 ]
Bowen, Paul [2 ]
Akintoye, Akintola [3 ]
机构
[1] Department of Construction Economics and Management, University of Cape Town, Rondebosch 7700, Private Bag
[2] School of the Built and Natural Environment, Glasgow Caledonian University, Glasgow, Scotland, Cowcaddens Road
关键词
Case study; Electricity; Risk management; South Africa; Stakeholder; Utility;
D O I
10.1016/j.ijproman.2007.03.011
中图分类号
学科分类号
摘要
This paper documents the risk management practice of a utility company for its Recovery Plan project to address the risks of power interruptions due to a shortfall of supply and increasing electricity demand. The company's corporate risk management process and its practice at divisional and project levels are discussed. The key role of stakeholders in risk identification, analysis, mitigation, monitoring and reporting is emphasised by the company and this drives its risk management practice. Despite the level of resources available within the company to use more sophisticated risk management tools, the company adopts simple risk management methods suggesting that a large size company does not necessarily use 'state of the art' risk management techniques. Recommendations for improved practice are made. © 2007 Elsevier Ltd and IPMA.
引用
收藏
页码:149 / 163
页数:14
相关论文
共 50 条
  • [21] Supply Chain Risk Management Identification and Mitigation: A Case Study in a Chinese Dairy Company
    Yu, Canglong
    Huatuco, Luisa Huaccho
    SUSTAINABLE DESIGN AND MANUFACTURING 2016, 2016, 52 : 475 - 486
  • [22] Managing the costs of HIV/AIDS: A case study of a South African contract cleaning company
    Gow, Jeff
    George, Gavin
    Grant, Bligh
    DEVELOPMENT SOUTHERN AFRICA, 2012, 29 (03) : 434 - 447
  • [23] Fire risk in informal settlements: A South African case study
    Morrissey, James
    Taylor, Anna
    OPEN HOUSE INTERNATIONAL, 2006, 31 (01) : 98 - 105
  • [24] Alleviating poverty through resource provision: The case of a South African agricultural project
    Maphosa, Beatrice
    INTERNATIONAL JOURNAL OF AFRICAN RENAISSANCE STUDIES, 2016, 11 (01): : 45 - 63
  • [25] Risk management workshop application: a case study of Ahwaz Urban Railway project
    Tavakolan, Mehdi
    Mohammadi, Amir
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2018, 18 (03) : 260 - 274
  • [26] VALIDATING A UTILITY AND TRUST IN MOBILE BANKING SCALE IN THE SOUTH AFRICAN CONTEXT
    Van Deventer, Marko
    PROCEEDINGS OF THE 8TH BUSINESS & MANAGEMENT CONFERENCE, 2018, : 248 - 261
  • [27] The perceived value of Enterprise Risk Management in the South African business environment
    Havenga, A.
    Venter, P.
    SOUTHERN AFRICAN BUSINESS REVIEW, 2007, 11 (03) : 74 - 94
  • [28] Management concepts and project performance: perceptions from the South African public sector environment
    Emuze, F. A.
    Smallwood, J. J.
    JOURNAL OF THE SOUTH AFRICAN INSTITUTION OF CIVIL ENGINEERING, 2013, 55 (02) : 21 - 28
  • [29] The readability and narrative tone of risk and risk management disclosures for South African listed companies
    Enslin, Zack
    du Toit, Elda
    Puane, Mangwakong Faith
    JOURNAL OF ACCOUNTING IN EMERGING ECONOMIES, 2025, 15 (01) : 224 - 241
  • [30] INFORMATION TECHNOLOGY RISK MANAGEMENT USING FRAP (A CASE OF INSURANCE COMPANY)
    Gui, Anderes
    Haron, Hasnah
    Sabrina, Cecilia
    Timoti, Jerom
    Yusuf, Mochamad
    Pratiwi, Septy Debby
    INDUSTRIAL DESIGN AND MECHANICS POWER II, 2013, 437 : 857 - +