共 14 条
[1]
KAREN P., Renewables 101: integrating renewable energy resources into the grid[EB/OL]
[2]
Regulation capability enhancement of new power system and policy research[EB/OL]
[3]
Revised draft final proposal—flexible ramping product [R], (2015)
[4]
Addendum—draft final technical appendix-flexible ramping product [R], (2016)
[5]
Draft technical description—flexible ramping product-procurement-deployment-arios[EB/OL]
[6]
Demand curves for operating reserve,regulating and spinning[R], (2022)
[7]
CHEN Qixin, FANG Xichen, GUO Hongye, Et al., Progress and key issues for construction of electricity spot market[J], Automation of Electric Power Systems, 45, 6, pp. 3-15, (2021)
[8]
Notice on the issuance of the management measures of electricity auxiliary services[EB/OL]
[9]
YU Jie, LIU Yunren, YANG Jiaqi, Et al., Analysis of development of California ancillary service market and its enlightenment to China’s power market[J], Power System Technology, 43, 8, pp. 2711-2717, (2019)
[10]
WANG Lingling, LIU Lian, ZHANG Ke, Et al., A review of power system flexible ramping product and market mechanism [J], Power System Technology, 46, 2, pp. 442-452, (2022)