Analyses of Pre-Excavation Grouting for TBM Tunnelling

被引:0
|
作者
Wannenmacher H. [1 ]
Schlicke M. [2 ]
机构
[1] Implenia Österreich GmbH., Tunnelling & Civil Engineering, Innsbrucker Bundesstraße 67, Salzburg
[2] Technical University of Munich, Chair of Construction Process Management, Arcisstrasse 21, München
来源
Geomechanik und Tunnelbau | 2023年 / 16卷 / 01期
关键词
Grouting; Mechanized tunneling; Pre-Excavation Grouting; Sealing; TBM; Tunnel; Unlined Tunnels; Utility tunnels; Water Inflow;
D O I
10.1002/geot.202200069
中图分类号
学科分类号
摘要
Pre-excavation grouting (PEG) is essential for mitigating groundwater inflow to unlined tunnel structures. Prevention of initial water inflow proved best practice to balance groundwater conditions throughout the utilisation of a tunnel. The grouted rock mass acts as a circumferential sealing barrier instead of a secondary lining to minimise groundwater inflow to an acceptable level over the structure's lifetime. The construction of unlined tunnels relies on existing favourable in-situ rock mass conditions with an overall low hydraulic head, mainly to keep the effort of grouting inferior and avoid an unbalanced proportion of pre-excavation grouting during the tunnel construction works. From the operational perspective of tunnelling works, pre-excavation grouting delineates the continuous excavation process of a TBM and represents a discontinuative work process. In addition, grouting includes an exploration process ahead of the cutterhead to predict the ground conditions to align the sealing demand of the rock mass. Generally, pre-excavation grouting foresees the drilling of mainly open boreholes with a considerable length of 20 m to 25 m ahead of the tunnel boring machine (TBM). Establishing a continuous grouted zone around the tunnel demands an overlapping of the grouting rings ranging from 2 m to 10 m. The overlapping decreases the excavation length of the TBM adequately. The repetitive grouting process interfering with the excavation consists of various processes such as exploration including water loss measuring (WLM), the drilling and grouting of boreholes and the hardening time. TBM tunnelling depends on the systematic and continuous implementation of construction procedures. Therefore, based on current static pre-excavation grouting, an agile combined grouting and excavation approach is presented, incorporating a reliable pre-excavation grouting, a systematic TBM excavation and a specific balance of long-term sealing and high utilisation rates for TBM excavation. © 2023, Ernst und Sohn. All rights reserved.
引用
收藏
页码:55 / 59
页数:4
相关论文
共 50 条
  • [41] Soil consolidation associated with grouting during shield tunnelling in soft clayey ground
    Komiya, K
    Soga, K
    Akagi, H
    Jafari, MR
    Bolton, MD
    GEOTECHNIQUE, 2001, 51 (10): : 835 - 846
  • [42] Considerations for rock mass grouting for tunnelling in faulted rock masses with tubes á manchette
    Wannenmacher H.
    Entfellner M.
    Krenn H.
    Geomechanik und Tunnelbau, 2019, 12 (02): : 158 - 167
  • [43] The application of the guideline for the geotechnical design of underground structures with TBM excavation in Austria
    Poisel A.
    Meier A.
    Bach D.
    Geomechanik und Tunnelbau, 2023, 16 (01): : 38 - 46
  • [44] Physical experimental study on excavation disturbance of TBM in deep composite strata
    Shi Lin-ken
    Zhou Hui
    Song Ming
    Lu Jing-jing
    Zhang Chuan-qing
    Lu Xin-jing
    ROCK AND SOIL MECHANICS, 2020, 41 (06) : 1933 - 1943
  • [45] Typical difficulties and improvement measures in TBM excavation of hard rock tunnels
    Zhou Z.-L.
    Dong J.-P.
    Wang S.-F.
    Cai X.
    Zhou K.
    Zhongguo Youse Jinshu Xuebao/Chinese Journal of Nonferrous Metals, 2023, 33 (04): : 1297 - 1317
  • [46] Challenges of methods and approaches for estimating soil abrasivity in soft ground TBM tunnelling
    Jakobsen, P. D.
    Lohne, J.
    WEAR, 2013, 308 (1-2) : 166 - 173
  • [47] Analyses of Seepage Problems in a Subsea Tunnel Considering Effects of Grouting and Lining Structure
    Yang, Guangcheng
    Wang, Xinghua
    Wang, Xiangge
    Cao, Yonggang
    MARINE GEORESOURCES & GEOTECHNOLOGY, 2016, 34 (01) : 65 - 70
  • [48] Research on Prediction of TBM Tunnelling Parameters Based on GRU-RF Model
    Man K.
    Cao Z.
    Liu X.
    Song Z.
    Liu R.
    Yingyong Jichu yu Gongcheng Kexue Xuebao/Journal of Basic Science and Engineering, 2023, 31 (06): : 1519 - 1539
  • [49] Predicting advance rate and cutter life in TBM tunnelling using evolutionary algorithm
    Sahinoglu, Ulku Kalayci
    Karakus, Murat
    INTERNATIONAL JOURNAL OF MINING RECLAMATION AND ENVIRONMENT, 2024, 38 (05) : 390 - 406
  • [50] Laboratory study of deformation and failure of soft rock for deep ground tunnelling with TBM
    Huang, Xing
    Liu, Quansheng
    Liu, Kaide
    Kang, Yongshui
    Liu, Xuewei
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2015, 34 (01): : 76 - 92