Analyses of Pre-Excavation Grouting for TBM Tunnelling

被引:0
|
作者
Wannenmacher H. [1 ]
Schlicke M. [2 ]
机构
[1] Implenia Österreich GmbH., Tunnelling & Civil Engineering, Innsbrucker Bundesstraße 67, Salzburg
[2] Technical University of Munich, Chair of Construction Process Management, Arcisstrasse 21, München
来源
Geomechanik und Tunnelbau | 2023年 / 16卷 / 01期
关键词
Grouting; Mechanized tunneling; Pre-Excavation Grouting; Sealing; TBM; Tunnel; Unlined Tunnels; Utility tunnels; Water Inflow;
D O I
10.1002/geot.202200069
中图分类号
学科分类号
摘要
Pre-excavation grouting (PEG) is essential for mitigating groundwater inflow to unlined tunnel structures. Prevention of initial water inflow proved best practice to balance groundwater conditions throughout the utilisation of a tunnel. The grouted rock mass acts as a circumferential sealing barrier instead of a secondary lining to minimise groundwater inflow to an acceptable level over the structure's lifetime. The construction of unlined tunnels relies on existing favourable in-situ rock mass conditions with an overall low hydraulic head, mainly to keep the effort of grouting inferior and avoid an unbalanced proportion of pre-excavation grouting during the tunnel construction works. From the operational perspective of tunnelling works, pre-excavation grouting delineates the continuous excavation process of a TBM and represents a discontinuative work process. In addition, grouting includes an exploration process ahead of the cutterhead to predict the ground conditions to align the sealing demand of the rock mass. Generally, pre-excavation grouting foresees the drilling of mainly open boreholes with a considerable length of 20 m to 25 m ahead of the tunnel boring machine (TBM). Establishing a continuous grouted zone around the tunnel demands an overlapping of the grouting rings ranging from 2 m to 10 m. The overlapping decreases the excavation length of the TBM adequately. The repetitive grouting process interfering with the excavation consists of various processes such as exploration including water loss measuring (WLM), the drilling and grouting of boreholes and the hardening time. TBM tunnelling depends on the systematic and continuous implementation of construction procedures. Therefore, based on current static pre-excavation grouting, an agile combined grouting and excavation approach is presented, incorporating a reliable pre-excavation grouting, a systematic TBM excavation and a specific balance of long-term sealing and high utilisation rates for TBM excavation. © 2023, Ernst und Sohn. All rights reserved.
引用
收藏
页码:55 / 59
页数:4
相关论文
共 50 条
  • [21] Influence of Corrosion on the Abrasion of Cutter Steels Used in TBM Tunnelling
    N. Espallargas
    P. D. Jakobsen
    L. Langmaack
    F. J. Macias
    Rock Mechanics and Rock Engineering, 2015, 48 : 261 - 275
  • [22] Development and application of cutterhead vibration monitoring system for TBM tunnelling
    Wu, Fan
    Gong, Qiuming
    Li, Zhigang
    Qiu, Haifeng
    Jin, Cheng
    Huang, Liu
    Yin, Lijun
    INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2021, 146 (146)
  • [23] Influence of Corrosion on the Abrasion of Cutter Steels Used in TBM Tunnelling
    Espallargas, N.
    Jakobsen, P. D.
    Langmaack, L.
    Macias, F. J.
    ROCK MECHANICS AND ROCK ENGINEERING, 2015, 48 (01) : 261 - 275
  • [24] The Vibration Analysis of TBM Tunnelling Parameters Based on Dynamic Model
    Wu, Hanyang
    Huo, Junzhou
    Song, Xueguan
    Wang, Lintao
    Sun, Wei
    INTELLIGENT ROBOTICS AND APPLICATIONS (ICIRA 2015), PT III, 2015, 9246 : 489 - 500
  • [25] Case study on the influence of rock brittleness on the TBM tunnelling performance
    Li, Qingwei
    Du, Lijie
    Yang, Yalei
    Liu, Leitao
    Zhao, Xiangbo
    Xu, Guangchun
    SCIENTIFIC REPORTS, 2024, 14 (01):
  • [26] Application of grouting for stopping water in shaft excavation for thermal engineering
    Dong, S. (dsm@bhpd.com), 1600, Editorial By Modern Tunnelling Technology, China (51):
  • [27] Numerical analysis for the excavation of geotechnical material in tunnel and grouting effect
    Cai, Kejian
    TRENDS IN CIVIL ENGINEERING, PTS 1-4, 2012, 446-449 : 1581 - 1584
  • [28] Identification of Surrounding Rock in TBM Excavation with Deep Neural Network
    Nie, ShiWu
    Xue, Lin
    Jia, GuoPeng
    Ma, Yue
    Chen, Jing
    Huo, JunZhou
    2019 2ND INTERNATIONAL CONFERENCE ON ARTIFICIAL INTELLIGENCE AND BIG DATA (ICAIBD 2019), 2019, : 251 - 255
  • [29] Key Technology of TBM Excavation in Soft and Broken Surrounding Rock
    Zhao, Hailei
    Quan, Yongwei
    Zhou, Jianjun
    Wang, Liming
    Yang, Zhenxing
    APPLIED SCIENCES-BASEL, 2023, 13 (13):
  • [30] Grouting of TBM rock tunnel for the Pinalito hydroelectric plant, Dominican Republic
    Hartwig, Marcos Eduardo
    Soils and Rocks, 2009, 32 (03): : 143 - 148