Analyses of Pre-Excavation Grouting for TBM Tunnelling

被引:0
|
作者
Wannenmacher H. [1 ]
Schlicke M. [2 ]
机构
[1] Implenia Österreich GmbH., Tunnelling & Civil Engineering, Innsbrucker Bundesstraße 67, Salzburg
[2] Technical University of Munich, Chair of Construction Process Management, Arcisstrasse 21, München
来源
Geomechanik und Tunnelbau | 2023年 / 16卷 / 01期
关键词
Grouting; Mechanized tunneling; Pre-Excavation Grouting; Sealing; TBM; Tunnel; Unlined Tunnels; Utility tunnels; Water Inflow;
D O I
10.1002/geot.202200069
中图分类号
学科分类号
摘要
Pre-excavation grouting (PEG) is essential for mitigating groundwater inflow to unlined tunnel structures. Prevention of initial water inflow proved best practice to balance groundwater conditions throughout the utilisation of a tunnel. The grouted rock mass acts as a circumferential sealing barrier instead of a secondary lining to minimise groundwater inflow to an acceptable level over the structure's lifetime. The construction of unlined tunnels relies on existing favourable in-situ rock mass conditions with an overall low hydraulic head, mainly to keep the effort of grouting inferior and avoid an unbalanced proportion of pre-excavation grouting during the tunnel construction works. From the operational perspective of tunnelling works, pre-excavation grouting delineates the continuous excavation process of a TBM and represents a discontinuative work process. In addition, grouting includes an exploration process ahead of the cutterhead to predict the ground conditions to align the sealing demand of the rock mass. Generally, pre-excavation grouting foresees the drilling of mainly open boreholes with a considerable length of 20 m to 25 m ahead of the tunnel boring machine (TBM). Establishing a continuous grouted zone around the tunnel demands an overlapping of the grouting rings ranging from 2 m to 10 m. The overlapping decreases the excavation length of the TBM adequately. The repetitive grouting process interfering with the excavation consists of various processes such as exploration including water loss measuring (WLM), the drilling and grouting of boreholes and the hardening time. TBM tunnelling depends on the systematic and continuous implementation of construction procedures. Therefore, based on current static pre-excavation grouting, an agile combined grouting and excavation approach is presented, incorporating a reliable pre-excavation grouting, a systematic TBM excavation and a specific balance of long-term sealing and high utilisation rates for TBM excavation. © 2023, Ernst und Sohn. All rights reserved.
引用
收藏
页码:55 / 59
页数:4
相关论文
共 50 条
  • [1] The Stockholm Bypass – Design and execution of grouting works: Pre-excavation grouting by means of rock fissure grouting with cementitious grouts
    Creütz M.
    Osterman F.
    Geomechanik und Tunnelbau, 2019, 12 (02): : 147 - 157
  • [2] Pre-excavation grouting in rock tunneling – Dealing with high groundwater pressures
    Hognestad H.-O.
    Kieffer S.
    Geomechanik und Tunnelbau, 2019, 12 (02): : 141 - 146
  • [3] Experience from pre-excavation and leakage closing injections obtained in the Follo Line Project
    Gollegger J.
    Geomechanik und Tunnelbau, 2022, 15 (05): : 550 - 554
  • [4] Effects of water related factors on pre-grouting in hard rock tunnelling
    Mao, Dawei
    Lu, Ming
    Zhao, Zhiye
    Ng, Melvin
    15TH INTERNATIONAL SCIENTIFIC CONFERENCE UNDERGROUND URBANISATION AS A PREREQUISITE FOR SUSTAINABLE DEVELOPMENT, 2016, 165 : 300 - 307
  • [5] Grouting technology in tunnelling
    Injektionstechnik im tunnelbau
    Kogler, K. (Kurt.Kogler@zueblin.at), 1600, Ernst und Sohn (06):
  • [6] Consolidation grouting using horizontal directional drilling technology in the Praga district of Warsaw prior to TBM tunnelling
    Barbanti, Marco
    Bonanno, Marco
    Rigazio, Andrea
    Geomechanik und Tunnelbau, 2014, 7 (03): : 248 - 254
  • [7] TBM mechanical characteristics for NFGM in mechanized tunnelling
    Hwang, Pill-Bae
    Kim, Beom-Ju
    Lee, Seok-Won
    GEOMECHANICS AND ENGINEERING, 2024, 38 (05) : 477 - 486
  • [8] Calculation model of unlimited earth pressure on both sides of enclosure wall during pre-excavation dewatering
    Xue Xiu-Li
    Liu Zhi-Heng
    Zeng Chao-Feng
    Bai Ning
    Chen Hong-Bo
    ROCK AND SOIL MECHANICS, 2024, 45 (06) : 1699 - 1708
  • [9] Numerical simulating of pre-grouting in multi-jointed rock mass in deep coalmine roadway excavated via TBM
    Xue, Xinran
    Zhang, Kai
    Ma, Bailong
    Xiao, Fangyuan
    Jiang, Tao
    COMPUTERS AND GEOTECHNICS, 2023, 154
  • [10] Tunnelling and compensation grouting at Bond Street, London
    Farrell, Ruaidhri P.
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-GEOTECHNICAL ENGINEERING, 2015, 168 (06) : 471 - 482