共 18 条
- [1] Alaykyran K., Engin O., Doyen A., Using ant colony optimization to solve hybrid flow shop scheduling problems, International Journal of Advanced Manufacturing Technology, 35, 5, pp. 541-550, (2007)
- [2] Damodaran P., Diyadawagamage D., Ghrayeb O., Velez-Gallego M., A particle swarm optimization algorithm for minimizing makespan of nonidentical parallel batch processing machines, International Journal of Advanced Manufacturing Technology, 58, 9-12, pp. 1131-1140, (2012)
- [3] Gupta J., Stafford E., Flowshop scheduling research after five decades, European Journal of Operational Research, 169, 3, pp. 699-711, (2006)
- [4] Jia Z., Zhang Y., Leung J.Y-T., Li K., Bi-criteria ant colony optimization algorithm for minimizing makespan and energy consumption on parallel batch machines, Applied Soft Computing, 55, pp. 226-237, (2017)
- [5] Jolai F., Asefi H., Rabiee M., Ramezani P., Bi-objective simulated annealing approaches for no-wait two-stage flexible flow shop scheduling problem, Scientia Iranica, 20, 3, pp. 861-872, (2013)
- [6] Li D., Meng X., Liang Q., Zhao J., A heuristic-search genetic algorithm for multi-stage hybrid flow shop scheduling with single processing machines and batch processing machines, Journal of Intelligent Manufacturing, 26, 5, pp. 873-890, (2015)
- [7] Luo H., Huang G.Q., Zhang Y., Dai Q., Chen X., Two-stage hybrid batching flowshop scheduling with blocking and machine availability constraints using genetic algorithm, Robotics and Computer-Integrated Manufacturing, 25, 6, pp. 962-971, (2009)
- [8] Marichelvam M.K., Prabaharan T., Yang X.S., Improved cuckoo search algorithm for hybrid flow shop scheduling problems to minimize makespan, Applied Soft Computing, 19, 6, pp. 93-101, (2014)
- [9] Mousavi S.M., Zandieh M., Yazdani M., A simulated annealing/local search to minimize the makespan and total tardiness on a hybrid flowshop, International Journal of Advanced Manufacturing Technology, 64, 1-4, pp. 369-388, (2013)
- [10] Muthuswamy S., Velez-Gallego M., Maya J., Rojas-Santiago M., Minimizing makespan in a two-machine no-wait flow shop with batch processing machines, International Journal of Advanced Manufacturing Technology, 63, 1-4, pp. 281-290, (2012)