共 28 条
[11]
Erol R., Sahin C., Baykasoglu A., Kaplanoglu V., A multi-agent based approach to dynamic scheduling of machines and automated guided vehicles in manufacturing sys-tems, Applied Soft Computing, 12, 6, pp. 1720-1732, (2012)
[12]
Udhayakumar P., Kumanan S., Integrated scheduling of flexible manufacturing system using evolutionary algo-rithms, The International Journal of Advanced Manufacturing Technology, 61, 5-8, pp. 621-635, (2011)
[13]
Zheng Y., Xiao Y., Seo Y., A tabu search algorithm for simultaneous machine/AGV scheduling problem, International Journal of Production Research, 52, 19, pp. 5748-5763, (2014)
[14]
Nishi T., Hiranaka Y., Grossmann I.E., A bilevel de-composition algorithm for simultaneous production scheduling and conflict-free routing for automated guided ve-hicles, Computers & Operations Research, 38, 5, pp. 876-888, (2011)
[15]
Lacomme P., Larabi M., Tchernev N., Job-shop based framework for simultaneous scheduling of machines and automated guided vehicles, International Journal of Production Economics, 143, 1, pp. 24-34, (2013)
[16]
Saidi-Mehrabad M., Dehnavi-Arani S., Evazabadian F., Mahmoodian V., An Ant Colony Algorithm (ACA) for solving the new integrated model of job shop scheduling and conflict-free routing of AGVs, Computers & Industrial Engineering, 86, pp. 2-13, (2015)
[17]
Chaudhry I.A., Mahmood S., Shami M., Simultaneous scheduling of machines and automated guided vehicles in flexible manufacturing systems using genetic algorithms, Journal of Central South University, 18, 5, pp. 1473-1486, (2011)
[18]
Umar U.A., Ariffin M.K.A., Ismail N., Tang S.H., Hybrid multiobjective genetic algorithms for integrated dy-namic scheduling and routing of jobs and automated-guided vehicle (AGV) in flexible manufacturing systems (FMS) en-vironment, The International Journal of Advanced Manufacturing Technology, 81, 9, pp. 2123-2141, (2015)
[19]
Lyu X., Song Y., He C., Lei Q., Guo W., Approach to integrated scheduling problems considering optimal num-ber of automated guided vehicles and conflict-free routing in flexible manufacturing systems, IEEE Access, 7, pp. 74909-74924, (2019)
[20]
Mousavi M., Yap H.J., Musa S.N., Tahriri F., Md Dawal S.Z., Multi-objective AGV scheduling in an FMS using a hybrid of genetic algorithm and particle swarm optimization, Plos One, 12, 3, (2017)