Job Shop Scheduling Using Genetic and Heuristic Exchange Algorithms for AGVs

被引:0
作者
Wang J.-K. [1 ]
Eoh G. [2 ]
Park T.-H. [3 ]
机构
[1] Department of Control Robot Engineering, Chungbuk National University
[2] Industrial AI Research Center, Chungbuk National University
[3] Department of Intelligent Systems and Robotics, Chungbuk National University
关键词
Autonomous ground vehicle; Genetic Algorithm; Job shop scheduling;
D O I
10.5302/J.ICROS.2022.21.0187
中图分类号
学科分类号
摘要
Solving a job shop scheduling problem (JSSP) entails allocating entire jobs to machines to minimize the processing time. Generally, the transit time between machines is not considered in the conventional JSSP because it is shorter than the processing time. In a real production environment, however, the transit time of an autonomous ground vehicle (AGV) is long due to the need to solve random problems, such as finding an indirect route or avoiding collisions. Moreover, AGVs sometimes need to transport the job on directional roads with upstream and downstream constraints. Therefore, we present an AGV job scheduling algorithm considering the transit time. This study considers not only the transportation times of the jobs from one machine to another but also collisions on limited roads, similar to in a real environment. A near-optimal job sequence was obtained by combining the genetic algorithm (GA) with simulation and was comparing this with the traditional method. Additionally, this paper presents heuristics that deal with deadlocks in the process of combining JSSP and simulation. The combination of GA and heuristics was tested using various simulations. © ICROS 2022.
引用
收藏
页码:191 / 201
页数:10
相关论文
共 28 条
[11]  
Erol R., Sahin C., Baykasoglu A., Kaplanoglu V., A multi-agent based approach to dynamic scheduling of machines and automated guided vehicles in manufacturing sys-tems, Applied Soft Computing, 12, 6, pp. 1720-1732, (2012)
[12]  
Udhayakumar P., Kumanan S., Integrated scheduling of flexible manufacturing system using evolutionary algo-rithms, The International Journal of Advanced Manufacturing Technology, 61, 5-8, pp. 621-635, (2011)
[13]  
Zheng Y., Xiao Y., Seo Y., A tabu search algorithm for simultaneous machine/AGV scheduling problem, International Journal of Production Research, 52, 19, pp. 5748-5763, (2014)
[14]  
Nishi T., Hiranaka Y., Grossmann I.E., A bilevel de-composition algorithm for simultaneous production scheduling and conflict-free routing for automated guided ve-hicles, Computers & Operations Research, 38, 5, pp. 876-888, (2011)
[15]  
Lacomme P., Larabi M., Tchernev N., Job-shop based framework for simultaneous scheduling of machines and automated guided vehicles, International Journal of Production Economics, 143, 1, pp. 24-34, (2013)
[16]  
Saidi-Mehrabad M., Dehnavi-Arani S., Evazabadian F., Mahmoodian V., An Ant Colony Algorithm (ACA) for solving the new integrated model of job shop scheduling and conflict-free routing of AGVs, Computers & Industrial Engineering, 86, pp. 2-13, (2015)
[17]  
Chaudhry I.A., Mahmood S., Shami M., Simultaneous scheduling of machines and automated guided vehicles in flexible manufacturing systems using genetic algorithms, Journal of Central South University, 18, 5, pp. 1473-1486, (2011)
[18]  
Umar U.A., Ariffin M.K.A., Ismail N., Tang S.H., Hybrid multiobjective genetic algorithms for integrated dy-namic scheduling and routing of jobs and automated-guided vehicle (AGV) in flexible manufacturing systems (FMS) en-vironment, The International Journal of Advanced Manufacturing Technology, 81, 9, pp. 2123-2141, (2015)
[19]  
Lyu X., Song Y., He C., Lei Q., Guo W., Approach to integrated scheduling problems considering optimal num-ber of automated guided vehicles and conflict-free routing in flexible manufacturing systems, IEEE Access, 7, pp. 74909-74924, (2019)
[20]  
Mousavi M., Yap H.J., Musa S.N., Tahriri F., Md Dawal S.Z., Multi-objective AGV scheduling in an FMS using a hybrid of genetic algorithm and particle swarm optimization, Plos One, 12, 3, (2017)