Integrated production and non-cyclical maintenance planning in flow-shop environment with limited buffer

被引:0
|
作者
DerakhshanHoreh S. [1 ]
Bijari M. [1 ]
机构
[1] Department of Industrial and Systems Engineering, Isfahan University of Technology, Isfahan
关键词
fix; limited buffer; lot-sizing; non-cyclical preventive maintenance; optimise algorithm; scheduling;
D O I
10.1504/IJISE.2023.134718
中图分类号
学科分类号
摘要
In this paper, we work on a problem of determination of production and maintenance scheduling as well as the production lot sizes in flow-shop environment with limited buffer. We introduce a new mathematical model that can schedule production and non-cyclical maintenance activities. The objective of the problem is minimising the total costs consisting of production, setup, inventory and preventive maintenance costs. A method for linearising the mathematical model is introduced. Since the problem is NP-hard, solving the problem with proposed mathematical model in large and medium sizes is hard and time consuming. Hence, two heuristic algorithms based on fix and optimise approach are developed. For checking the solution quality, the numerical results of heuristic algorithms are compared with optimal solution, lower bound value and the best answer that gained among the examples. Copyright © 2023 Inderscience Enterprises Ltd.
引用
收藏
页码:291 / 320
页数:29
相关论文
共 34 条
  • [1] An Integrated Non-Cyclical Preventive Maintenance and Production Planning Model for a Multi-Product Production System
    Liu, X.
    Wang, W.
    Zhang, T.
    Zhai, Q.
    Peng, R.
    2015 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2015, : 494 - 498
  • [2] Effect of Maintenance Resource Constraints on Flow-Shop Environment in a Joint Production and Maintenance Context
    Kumar, Sandeep
    Lad, Bhupesh Kumar
    2016 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2016, : 641 - 645
  • [3] Optimisation of flow-shop scheduling with batch processor and limited buffer
    Fu, Qing
    Sivakumar, Appa Iyer
    Li, Kunpeng
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (08) : 2267 - 2285
  • [4] Integrated non-cyclical preventive maintenance scheduling and production planning for multi-parallel component production systems with interdependencies-induced degradation
    Bahou, Ziyad
    Lemnaouar, Mohamed Reda
    Krimi, Issam
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2024, 130 (9-10): : 4723 - 4749
  • [5] Integrated non-cyclical preventive maintenance scheduling and production planning for multi-parallel component production systems with interdependencies-induced degradation
    Ziyad Bahou
    Mohamed Reda Lemnaouar
    Issam Krimi
    The International Journal of Advanced Manufacturing Technology, 2024, 130 : 4723 - 4749
  • [6] Integrating non-cyclical preventive maintenance scheduling and production planning for a series-parallel production line with stochastic dependence
    Bahou Z.
    Krimi I.
    Ait El Cadi A.
    Hachemi N.E.
    International Journal of Industrial and Systems Engineering, 2024, 47 (03) : 354 - 381
  • [7] Local Search for Integrated Predictive Maintenance and Scheduling in Flow-Shop
    Ecoretti, Andrea
    Ceschia, Sara
    Schaerf, Andrea
    METAHEURISTICS, MIC 2022, 2023, 13838 : 260 - 273
  • [8] Integrated optimisation on flow-shop production with cutting stock
    Wang, Weihao
    Shi, Zhongshun
    Shi, Leyuan
    Zhao, Qingbin
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 57 (19) : 5996 - 6012
  • [9] Dynamic reservation method of limited buffer capacity in reentrant flexible flow-shop
    Han Z.-H.
    Liu Y.-H.
    Shi H.-B.
    Kongzhi Lilun Yu Yingyong/Control Theory and Applications, 2023, 40 (11): : 2059 - 2073
  • [10] Dynamic Drum-Buffer-Rope approach for production planning and control in capacitated flow-shop manufacturing systems
    Georgiadis, Patroklos
    Politou, Alexandra
    COMPUTERS & INDUSTRIAL ENGINEERING, 2013, 65 (04) : 689 - 703