Prediction of landslide displacement based on previous accumulated rainfall and Gaussian process regression model

被引:0
作者
Chen L. [1 ]
Chen Y. [2 ]
He J. [2 ]
Lyu S. [1 ]
机构
[1] Chongqing Steel Xichang Minning Co.,Ltd., China Baowu Steel Group Corporation, Sichuan, Xichang
[2] Sichuan Province Ninth Geological Brigade, Sichuan Bureau of Geology and Mineral Resources, Sichuan, Deyang
来源
Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering | 2024年 / 43卷
关键词
accumulated rainfall in the early stage; Gaussian process regression; landslide displacement prediction; slope engineering; time series analysis;
D O I
10.13722/j.cnki.jrme.2023.1107
中图分类号
学科分类号
摘要
Rainfall is an important factor inducing landslide deformation. Traditional displacement time series prediction models only consider historical displacement and do not consider the impact of rainfall to conduct landslide displacement prediction , resulting in significant errors in the medium to long term or long-term displacement prediction. Given that the Gaussian process regression(GPR) algorithm has the advantages of easy realization,adaptive acquisition of hyperparameter and probability significance of prediction output,a GPR prediction model of landslide displacement considering the previous accumulated rainfall by introducing the cumulative rainfall index is established in this study,which improves the long-term displacement prediction capability of the model. Taking the landslide in the southern mining area of Xichang as an example,the relationship curve of landslide displacement and daily cumulative rainfall was first analyzed,and the Pearson method was used to calculate the correlation coefficient between the landslide displacement and the previous cumulative rainfall days;Secondly,a GPR model was established,and trained and tested using existing monitoring data. The results showed that the prediction accuracy of the established model was significantly improved compared to the model without considering the previous accumulated rainfall. On this basis,a long-term displacement trend prediction was conducted for monitoring points S1–1 and S1–2,and a comparative analysis was performed on the displacement trend under the assumption of increasing rainfall by 10% and 20%. The results indicate that a 20% increase in rainfall leads to an increase in the deformation rate of the landslide to about 17 mm/d. Without taking control measures,the landslide will experience accelerated sliding to instability. © 2024 Academia Sinica. All rights reserved.
引用
收藏
页码:3492 / 3497
页数:5
相关论文
共 17 条
  • [1] TANG Dong, LI Dianqing, ZHOU Chuangbing, Et al., Slope stability analysis considering antecedent rainfall process[J], Rock and Soil Mechanics, 34, 11, pp. 3239-3248, (2013)
  • [2] ZHANG Zhen, LI Shihai, MA Li, Probability analysis of relationship between landslide and rainfall in Chongqing Area[J], Chinese Journal of Rock Mechanics and Engineering, 24, 17, pp. 3185-3191, (2005)
  • [3] ZHU Zhijie, LU Shuqiang, MEI Jun, Study on Landslide displacement-rainfall correlation based on effective rainfall[J], Journal of Yangtze River Scientific Research Institute, 40, 12, pp. 162-168, (2023)
  • [4] WANG Nianqin, WANG Yongfeng, LUO Donghai, Et al., Review of landslide prediction and forecast research in China[J], Geological Review, 54, 3, pp. 355-360, (2008)
  • [5] SAITO M., Forecasting time of slope failure by tertiary creep[C], Proceedings of the 7th International Conference on Soil Mechanics and Foundation Engineering, pp. 677-683, (1969)
  • [6] CHEN Mingdong, YU Lansheng, Grey prediction method for slope deformation and failure, Proceedings of the Third National Engineering Geological Congress, (1988)
  • [7] LIU Dingwen, Application of catastrophe theory in the study of earthquake genesis seismic hazard and rock mass stability evaluation[J], Recent Developments in World Seismology, 3, pp. 35-36, (1991)
  • [8] QIN Siqing, ZHANG Zhuoyuan, WANG Shitian, Et al., Catastrophe theory and grey catastrophe theory method for landslide time prediction[J], Discovery of Nature, 46, 4, pp. 62-68, (1993)
  • [9] HUANG Runqiu, XU Qiang, Collaborative prediction model for slope instability time[J], Mountain Research, 15, 1, pp. 7-12, (1997)
  • [10] YANG Beibei, YIN Kunlong, DU Juan, A model for predicting landslide displacement based on time series and long and short term memory neural network[J], Chinese Journal of Rock Mechanics and Engineering, 37, 10, pp. 2334-2343, (2018)