Key technology research and engineering practice of speedy drivage with driving and bolting integration in soft surrounding rock

被引:0
作者
Wang H. [1 ]
Li F. [2 ,3 ]
Zhang X. [2 ,3 ]
机构
[1] China Coal Technology and Engineering Group Co., Ltd., Beijing
[2] Taiyuan Research Institute Co., Ltd., China Coal Technology and Engineering Group, Taiyuan
[3] National Engineering Laboratory of Coal Mining Machinery, Taiyuan
来源
Meitan Kexue Jishu/Coal Science and Technology (Peking) | 2024年 / 52卷 / 01期
关键词
collaborative support; drilling and bolting integration; driving and bolting integration; soft rock roadway; speedy drivage;
D O I
10.13199/j.cnki.cst.2023-0544
中图分类号
学科分类号
摘要
The technology and equipment of speedy drivage with driving and bolting integration of soft surrounding rock is an urgent need for safe and efficient mining and intelligent construction of coal mines. Based on the background of mining roadway engineering with such a swelling soft rock and jointed soft rock, the development status of speedy drivage technology of bolter miner at home and abroad is sorted out, and three problems faced by speedy drivage of bolter miner under soft surrounding rock conditions are analyzed, including: disturbance control of surrounding rock by full width cutting, timely and efficient permanent support of soft surrounding rock, temporary support of lateral wall in speedy drivage of soft surrounding rock. Five key technologies for speedy drivage of soft surrounding rock are proposed, including: ①Low disturbance cutting technology. It mainly includes elliptical full-width cutting drum, pick arrangement optimization, cutting dynamics optimization, etc. ②Timely support technology to reduce the distance between coal face and permanent support for roof or lateral wall. This technology is based on the integrated technology of excavation and anchoring. Through the research of the multidriller integral sliding platform integrating double cylindrical guidance, multi-link lifting, supporting oil cylinder top and bottom support, and follow-up gangue curtain protection, the distance between coal face and permanent roof support of the bolter miner is reduced from 2.5 m to 1 m, and the empty side distance is reduced from 3.5 m to 1 m. ③Multi-dimensional collaborative support technology of soft surrounding rock. Considering the space-time synergistic effect between the bolt and anchor cable support parameters and the synergistic effect between the support body and the surrounding rock, the low-density strong bolt support is used to control the roof at the head, and the enhanced permanent support is implemented simultaneously at the rear. ④Drilling anchor integration technology. It mainly includes bolt structure and mechanical properties, anchoring agent materials and pumping. ⑤Coal side spraying temporary support technology. It mainly includes fast reaction high elongation spraying material, high proportion precision spraying pumping, irregular coal wall surface adaptive trajectory control, mine explosion-proof high-precision mechanical arm, spraying material matching supply, etc. Based on the above content, a controllable operation empty top distance bolter miner was developed and underground tests were carried out.The test shows that the equipment effectively shortens the empty roof distance and empty side distance, realizes the ' controllable ' empty roof distance, adapts to the speedy drivage of soft surrounding rock roadway, and doubles the excavation efficiency. © 2024 China Coal Society. All rights reserved.
引用
收藏
页码:280 / 287
页数:7
相关论文
共 16 条
  • [1] Hongpu KANG, Kang YI, Simulation study on dilatant and rheologic properties of soft rocks surrounding deep roadway and its application[J], Journal of China Coal Society, 48, 1, (2023)
  • [2] Yuxi HAO, WANG Jiong, YUAN Yue, Et al., Large deformation control technology for expansive and weak-cemented soft rock roadways in Shajihai coal mine[J], Journal of Mining & Safety Engineering, 33, 4, (2016)
  • [3] WANG Hong, WANG Bukang, ZHANG Xiaofeng, Et al., Key technology research and engineering practice of intelligent rapid development in coal mine[J], Journal of China Coal Society, 46, 7, (2021)
  • [4] Hong WANG, WANG Jianli, ZHANG Xiaofeng, Theory and technology of efficient roadway advance with driving and bolting integration[J], Journal of China Coal Society, 45, 6, (2020)
  • [5] Hongpu KANG, JIANG Pengfei, Fuqiang GAO, Et al., Analysis on stability of rock surrounding heading faces and technical approaches for rapid heading[J], Journal of China Coal Society, 46, 7, pp. 2023-2045, (2021)
  • [6] WANG Bukang, Analysis of the present situation and trend of the technology and equipment of coal mine roadway excavation[J], Coal Science and Technology, 48, 11, (2020)
  • [7] SUN Xiaoming, ZHANG Yong, Manchao HE, Et al., Research of high pre-stress NPR support technology in deep shaft roadway engineering[J], Journal of Mining Science and Technology, 8, 1, (2023)
  • [8] Hongpu KANG, JIANG Pengfei, Chang LIU, Et al., Current situation and development trend of rock bolting construction equipment in coal roadway[J], Industry and Mine Automation, 49, 1, (2023)
  • [9] WANG Jinping, ZHOU Hong, Jingdong LI, Et al., Research on integrated bolt-grouting supporting technology for composite soft rock roof roadway with water drenching and heaving floor[J], Coal Technology, 41, 7, (2022)
  • [10] KANG Hongpu, JIANG Pengfei, YANG Jianwei, Et al., Roadway soft coal control technology by means of grouting bolts with high pressure-shotcreting in synergy in more than 1 000 m deep coal mines[J], Journal of China Coal Society, 46, 3, (2021)