Flexible flow shop scheduling problem to minimize makespan with renewable resources

被引:0
|
作者
Abbaszadeh N. [1 ]
Asadi-Gangraj E. [1 ]
Emami S. [1 ]
机构
[1] Department of Industrial Engineering, Babol Noshirvani University of Technology, Babol
来源
Asadi-Gangraj, Ebrahim (e.asadi@nit.ac.ir) | 1853年 / Sharif University of Technology卷 / 28期
关键词
Flexible flow shop; MILP model; Particle Swarm Optimization (PSO); Renewable resources; Simulated annealing;
D O I
10.24200/SCI.2019.53600.3325
中图分类号
学科分类号
摘要
This paper deals with a Flexible Flow Shop (FFS) scheduling problem with unrelated parallel machines and a renewable resource shared among the stages. The FFS scheduling problem is one of the most common manufacturing environments, in which there is more than a machine in at least one production stage. In such a system, to decrease the processing times, additional renewable resources are assigned to the jobs or machines, which can lead to a decrease in the total completion time. For this purpose, a Mixed Integer Linear Programming (MILP) model is proposed to minimize the maximum completion time (makespan) in an FFS environment. The proposed model is computationally intractable. Therefore, a Particle Swarm Optimization (PSO) algorithm, as well as a hybrid PSO and Simulated Annealing (SA) algorithm named SA-PSO, are developed to solve the model. Through numerical experiments on randomly generated test problems, the authors demonstrate that the hybrid SA-PSO algorithm outperforms the PSO, especially for large size test problems. © 2021 Sharif University of Technology. All rights reserved.
引用
收藏
页码:1853 / 1870
页数:17
相关论文
共 50 条
  • [31] An immune algorithm approach to the scheduling of a flexible PCB flow shop
    D. Alisantoso
    L. P. Khoo
    P. Y. Jiang
    The International Journal of Advanced Manufacturing Technology, 2003, 22 : 819 - 827
  • [32] An immune algorithm approach to the scheduling of a flexible PCB flow shop
    Alisantoso, D
    Khoo, LP
    Jiang, PY
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2003, 22 (11-12): : 819 - 827
  • [33] JIT scheduling problem on flexible flow shop with machine break down, machine eligibility and setup times
    Kangarloo, N.
    Rezaeian, J.
    Khosrawi, X.
    JOURNAL OF MATHEMATICS AND COMPUTER SCIENCE-JMCS, 2016, 16 (01): : 50 - 68
  • [34] A study of flexible flow shop scheduling problem with variable processing times based on improved bat algorithm
    Bian J.
    Yang L.
    International Journal of Simulation and Process Modelling, 2020, 15 (03) : 245 - 254
  • [35] Multiple rules with game theoretic analysis for flexible flow shop scheduling problem with component altering times
    Han, Zhonghua
    Zhu, Yihang
    Ma, Xiaofu
    Chen, Zhili
    INTERNATIONAL JOURNAL OF MODELLING IDENTIFICATION AND CONTROL, 2016, 26 (01) : 1 - 18
  • [36] Energy-Efficient Flexible Flow Shop Scheduling Under Time-Of-Use Rates with Renewable Energy Sources
    Mhanna, Joyce
    Nouinou, Hajar
    Caillard, Simon
    Baudry, David
    IFAC PAPERSONLINE, 2024, 58 (19): : 319 - 324
  • [37] Scheduling a capacitated batch-processing machine to minimize makespan
    Damodaran, Purushothaman
    Srihari, Krishnaswami
    Lam, Sarah S.
    ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2007, 23 (02) : 208 - 216
  • [38] Local search algorithms for the multiprocessor flow shop scheduling problem
    Negenman, EG
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2001, 128 (01) : 147 - 158
  • [39] Solving the continuous flow-shop scheduling problem by metaheuristics
    Fink, A
    Voss, S
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 151 (02) : 400 - 414
  • [40] An effective hybrid optimization algorithm for the flow shop scheduling problem
    Sun Kai
    Yang Genke
    2006 IEEE INTERNATIONAL CONFERENCE ON INFORMATION ACQUISITION, VOLS 1 AND 2, CONFERENCE PROCEEDINGS, 2006, : 1234 - 1238