Flexible flow shop scheduling problem to minimize makespan with renewable resources

被引:0
|
作者
Abbaszadeh N. [1 ]
Asadi-Gangraj E. [1 ]
Emami S. [1 ]
机构
[1] Department of Industrial Engineering, Babol Noshirvani University of Technology, Babol
来源
Asadi-Gangraj, Ebrahim (e.asadi@nit.ac.ir) | 1853年 / Sharif University of Technology卷 / 28期
关键词
Flexible flow shop; MILP model; Particle Swarm Optimization (PSO); Renewable resources; Simulated annealing;
D O I
10.24200/SCI.2019.53600.3325
中图分类号
学科分类号
摘要
This paper deals with a Flexible Flow Shop (FFS) scheduling problem with unrelated parallel machines and a renewable resource shared among the stages. The FFS scheduling problem is one of the most common manufacturing environments, in which there is more than a machine in at least one production stage. In such a system, to decrease the processing times, additional renewable resources are assigned to the jobs or machines, which can lead to a decrease in the total completion time. For this purpose, a Mixed Integer Linear Programming (MILP) model is proposed to minimize the maximum completion time (makespan) in an FFS environment. The proposed model is computationally intractable. Therefore, a Particle Swarm Optimization (PSO) algorithm, as well as a hybrid PSO and Simulated Annealing (SA) algorithm named SA-PSO, are developed to solve the model. Through numerical experiments on randomly generated test problems, the authors demonstrate that the hybrid SA-PSO algorithm outperforms the PSO, especially for large size test problems. © 2021 Sharif University of Technology. All rights reserved.
引用
收藏
页码:1853 / 1870
页数:17
相关论文
共 50 条
  • [21] Scheduling rules for two-stage flexible flow shop scheduling problem subject to tail group constraint
    Li, Zhan-tao
    Chen, Qing-xin
    Mao, Ning
    Wang, Xiaoming
    Liu, Jianjun
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 146 (02) : 667 - 678
  • [22] Flexible flow shop scheduling with uniform parallel machines
    Kyparisis, GJ
    Koulamas, C
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 168 (03) : 985 - 997
  • [23] Flexible Flow Shop Scheduling Method with Public Buffer
    Han, Zhonghua
    Han, Chao
    Lin, Shuo
    Dong, Xiaoting
    Shi, Haibo
    PROCESSES, 2019, 7 (10)
  • [24] New formulation for scheduling flexible flow shop problems
    Esmaelian, Majid
    Mohammadi, Milad
    Shahmoradi, Hadi
    INTERNATIONAL JOURNAL OF INTERACTIVE DESIGN AND MANUFACTURING - IJIDEM, 2023, 17 (06): : 3305 - 3319
  • [25] New formulation for scheduling flexible flow shop problems
    Majid Esmaelian
    Milad Mohammadi
    Hadi Shahmoradi
    International Journal on Interactive Design and Manufacturing (IJIDeM), 2023, 17 : 3305 - 3319
  • [26] Hybrid Genetic Simulated Annealing Algorithm for Improved Flow Shop Scheduling with Makespan Criterion
    Wei, Hongjing
    Li, Shaobo
    Jiang, Houmin
    Hu, Jie
    Hu, Jianjun
    APPLIED SCIENCES-BASEL, 2018, 8 (12):
  • [27] MINIMIZING MAKESPAN FOR FLOW-SHOP SCHEDULING BY COMBINING SIMULATED ANNEALING WITH SEQUENCING KNOWLEDGE
    ZEGORDI, SH
    ITOH, KJ
    ENKAWA, T
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1995, 85 (03) : 515 - 531
  • [28] An enhanced invasive weed optimization for makespan minimization in a flexible flowshop scheduling problem
    Jolai, F.
    Tavakkoli-Moghaddam, R.
    Rabiee, M.
    Gheisariha, E.
    SCIENTIA IRANICA, 2014, 21 (03) : 1007 - 1020
  • [29] A novel metaheuristic approach for the flow shop scheduling problem
    Nearchou, AC
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2004, 17 (03) : 289 - 300
  • [30] Metaheuristic methods in hybrid flow shop scheduling problem
    Choong, F.
    Phon-Amnuaisuk, S.
    Alias, M. Y.
    EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (09) : 10787 - 10793