Study of rehabilitation plan of bottom outlet service and emergency gates of Karun 1 dam

被引:2
作者
Ghaderi M. [1 ,2 ]
机构
[1] Semnan University, Semnan
[2] Department of Design Office, Fanavari Novin Niroo Co., Tehran
关键词
barrages; dams; renovation/steel structures; reservoirs/rehabilitation; reclamation;
D O I
10.1680/jdare.20.00016
中图分类号
学科分类号
摘要
Rehabilitation and renovation of damaged tunnels and hydro-mechanical equipment of dam and power plant projects in Iran is a major challenge and has to be seriously planned for now. Considering that Karun 1 dam has been in service for more than 50 years, the service and emergency gates of this project showed extensive damage and needed to be replaced. In the absence of a maintenance intake gate in front of this tunnel and the impossibility of emptying the upstream reservoir-whose dependent power plants must work non-stop-the redesign and installation of new gates must be made under a water head of 110 m. Primarily, four solutions are investigated to repair or replace the damaged parts of service and emergency gates and casing to seal the tunnel; of which one is selected as the final procedure. Then the recommended method of installation of the gates under the water head of 110 m is examined. © 2020 ICE Publishing: All rights reserved.
引用
收藏
页码:91 / 96
页数:5
相关论文
共 6 条
[1]  
Bani Soltan S., Pirzadeh B., Kavianpour M.R., Numerical modeling of the removable drainage gate of Karun 1 dam with Fluent software, Proceeding of the 5th National Congress of Civil Engineering, (2010)
[2]  
Ghaderi M., Design of Emergency Gate and Bottom Outlet Drainage of Karun 1 Dam, (2011)
[3]  
Ghaderi M., T3 Tunnel Emergency Gate Sealing Method of Karun 1 Dam under Reservoir Head, (2011)
[4]  
Cures Studies of T3 Tunnel Hydro-Mechanic and Electrical Equipments of Karun 1 Dam, (2012)
[5]  
Hydrodynamic Forces, (1991)
[6]  
Rahimi A., Investigation and Evaluation Report on Tunnel and Bottom Outlet Gates of Karun 1 Dam, (2011)