共 54 条
- [1] Yin R.Y., A discussion on "smart" steel plant-view from physical system side, Iron Steel, 52, 6, (2017)
- [2] Zhang C.X., Wang H.F., Zhang S.R., Et al., Strategic study on green development of Chinese steel industry, Iron Steel, 50, 10, (2015)
- [3] Wu X.L., Sun S.D., Yang Z., Et al., Survey on multi-objective flexible Job Shop scheduling problem, Appl Res Comput, 24, 3, (2007)
- [4] Zheng Z., Long J.Y., Gao X.Q., Et al., Present situation and prospect of production control technology focusing on planning and scheduling in iron and steel enterprise, Comput Integr Manuf Syst, 20, 11, (2014)
- [5] Wang B., Wang C., Wang B., Et al., Comprehensive optimization of production planning and scheduling for steelmaking-continuous casting process, J Wuhan Univ Sci Technol, 37, 3, (2014)
- [6] Tang L.X., Liu J.Y., Rong A.Y., Et al., A review of planning and scheduling systems and methods for integrated steel production, Eur J Oper Res, 133, 1, (2001)
- [7] Touil A., Echchtabi A., Bellabdaoui A., Et al., A hybrid metaheuristic method to optimize the order of the sequences in continuous-casting, Int J Ind Eng Comput, 7, 3, (2016)
- [8] Tang L.X., Liu J.Y., Rong A.Y., Et al., A mathematical programming model for scheduling steelmaking-continuous casting production, Eur J Oper Res, 120, 2, (2000)
- [9] Pang X.F., Gao L., Pan Q.K., Et al., A novel Lagrangian relaxation level approach for scheduling steelmaking-refining-continuous casting production, J Cent South Univ, 24, 2, (2017)
- [10] Cui H.J., Luo X.C., An improved Lagrangian relaxation approach to scheduling steelmaking-continuous casting process, Comput Chem Eng, 106, (2017)