Preliminary study of shaping the railway track geometry in terms of their maintenance costs and capacity

被引:0
|
作者
Gołębiowski P. [1 ]
Kukulski J. [1 ]
机构
[1] Warsaw University of Technology, Faculty of Transport, Warsaw
关键词
Capacity; Maintenance cost; Rail durability; Railway infrastructure;
D O I
10.5604/01.3001.0014.1787
中图分类号
学科分类号
摘要
In Poland, due to the increase in investments made by railways in recent years, and thus the increase in the replacement value of transport infrastructure, the need for expenditure on infrastructure maintenance will increase in the next 30 years, or the development of the developed transport network will degrade. As part of the overall discipline of resource management, subdiscipline has emerged - infrastructure asset management. As part of the management of railway transport infrastructure, the demand for cheaper maintenance costs will grow. The cost reduction of infrastructure maintenance is possible through meticulous assessment of its condition, rational selection of locations and scope of repairs at the assumed risk level, as well as at the stage of preparation of new construction or modernization projects taking into account aspects of later maintenance. For some time, we have been observing the accumulation of knowledge (methods, programs, procedures) in the country and abroad enabling optimization of infrastructure condition assessment and programming of its maintenance. The implementation of these solutions may result in a more rational use of funds for infrastructure maintenance and not disturb its smooth functioning in operation. The article discusses aspects that should be considered in the design process of railway infrastructure. Particular attention was paid to the durability of steel components of the railway superstructure, maintenance costs as well as aspects related to the capacity of the track node. An example of dependence of selected values of radial arcs depending on their durability and maintenance costs was presented. It was proposed to change the track layout at the Warszawa Srodmiescie passenger stop planned for reconstruction. Calculations of kinematic parameters for various configurations of railway turnouts were performed. Also, calculations of the capacity for the existing track system solution as well as the proposed track system after reconstruction of the analysed Warszawa Srodmiescie railway station were also carried out. © 2020 Warsaw University of Technology. All rights reserved.
引用
收藏
页码:115 / 128
页数:13
相关论文
共 36 条
  • [1] Minimising costs in scheduling railway track maintenance
    Lake, M
    Ferreira, L
    Murray, M
    COMPUTERS IN RAILWAYS VII, 2000, 7 : 895 - 902
  • [2] Allocation of effective maintenance limit for railway track geometry
    Khajehei, Hamid
    Ahmadi, Alireza
    Soleimanmeigouni, Iman
    Nissen, Arne
    STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2019, 15 (12) : 1597 - 1612
  • [3] The impact of summer heatwaves on railway track geometry maintenance
    Davies, Ben
    Andrews, John
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART F-JOURNAL OF RAIL AND RAPID TRANSIT, 2021, 235 (09) : 1158 - 1171
  • [4] Data-driven optimization of railway maintenance for track geometry
    Sharma, Siddhartha
    Cui, Yu
    He, Qing
    Mohammadi, Reza
    Li, Zhiguo
    TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES, 2018, 90 : 34 - 58
  • [5] Exploring Different Alert Limit Strategies in the Maintenance of Railway Track Geometry
    Andrade, Antonio Ramos
    Teixeira, Paulo Fonseca
    JOURNAL OF TRANSPORTATION ENGINEERING, 2016, 142 (09)
  • [6] INFLUENCE OF TRACK GEOMETRY CONDITION MONITORING ON RAILWAY INFRASTRUCTURE MAINTENANCE PROCESSING
    Bureika, Gintautas
    Vaiciunas, Gediminas
    Shi, Dachuan
    Zanuy, Armando Carrillo
    TRANSPORT PROBLEMS, 2022, 17 (04) : 211 - 220
  • [7] Railway Track Geometry Degradation Modelling and Prediction for Maintenance Decision Support
    Rebello, Sinda
    Cholette, Michael E.
    Huy Truong-Ba
    Reddy, Venkat
    Rosser, Alan
    Watkin, Tina
    15TH WCEAM PROCEEDINGS, 2022, : 422 - 432
  • [8] Railway line capacity utilisation and its impact on maintenance costs
    Odolinski, Kristofer
    Boysen, Hans E.
    JOURNAL OF RAIL TRANSPORT PLANNING & MANAGEMENT, 2019, 9 : 22 - 33
  • [9] Prediction of railway track geometry defects: a case study
    Soleimanmeigouni, Iman
    Ahmadi, Alireza
    Nissen, Arne
    Xiao, Xun
    STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2020, 16 (07) : 987 - 1001
  • [10] Maintenance Decision Support Model for Railway Track Geometry Maintenance Planning Using Cost, Reliability, and Availability Factors: A Case Study
    Kasraei, Ahmad
    Zakeri, Jabbar Ali
    TRANSPORTATION RESEARCH RECORD, 2022, 2676 (07) : 161 - 172