Operational Result of Rooftop Photovoltaic System Analyzed in the Side of the Self-consumption in the Jeju Island

被引:0
作者
Lee J.-I. [1 ]
Lee G.-M. [1 ]
机构
[1] Dept. of Electrical Engineering., Jeju National University
关键词
Building Photovoltaic System; Capacity Factor; Electric Cost Saving; Greenhouse Gas Emissions; Renewable Energy; Rooftop Photovoltaic System;
D O I
10.5370/KIEE.2023.72.2.212
中图分类号
学科分类号
摘要
Global warming is pushing strongly penetration of renewable generation facilities over the world. Photovoltaic(PV) systems are specially spread fast according to their cheap installation cost. In this paper, we dealt with the economic analysis of the rooftop photovoltaic systems of the 3 public buildings in the Jeju Science Park. The following study results were obtained. The annual capacity factors of the 3 PV plants except the E building's PV system with 0 degree of PV array angle were more than about 14%. The payback periods of the 3 PV plants were 15, 18 and 21 year. The rule classifying the load peak time period for Jeju Island was changed in Sep. 2021. The change decreased the profit of the consumers self-using electric energy generated by PV system. The capacity factor (usage rate) of the PV systems of the 3 buildings were high during their electric power peak times. The greenhouse gas emission amount reduced by the 4 PV plants over a year was about 161.9 tonCO2eq. Copyright © The Korean Institute of Electrical Engineers.
引用
收藏
页码:212 / 221
页数:9
相关论文
共 17 条
[1]  
Reporter Sangdo Kim, $5.6 trillion in floods and droughts by 2050
[2]  
Korea's Four Seasons and 24 Seasons Changed by Climate Change!
[3]  
A Study on the Characteristics of Climate Change in Jeju Island, (2019)
[4]  
2050 Carbon neutral strategy of the Republic of Korea towards a sustainable and green society, (2020)
[5]  
The 4th Republic of Korea biennial renewal report according to the United Nations Framework Convention on Climate Change (UNFCCC), (2021)
[6]  
A press conference on the name of the energy-rich building company, (2022)
[7]  
So Junghun, Yu Byunggyu, Hwang Hyemi, Yu Gwonjong, Choi Juyeop, Performance Monitoring Results, Evaluation and Analysis of 50kW Grid-Connected PV System, Journal of the Korean Solar Energy Society, 27, 2, (2007)
[8]  
Hyun Sujin, Park Sera, Kim Soowan, Lee Gaemyoung, Oh Seongbo, Hwang Choonggu, Analysis of Generated Electric Energy in the 1MW Rooftop Photovoltaic Power Plant, Proceedings of the 2014 Fall Conference of the Smart Grid Research Society of the Korean Institute of Electrical Engineers, pp. 151-153, (2014)
[9]  
Park Kyuho, Oh Eunbin, Lee Sujin, Kim Suwan, Baatarbileg Ankhzaya, Lee Geemyoung, Analysis of Sale Price of Electrical Energy Generated by a Large-scale Photovoltaic Plant in Jeju Island, Journal of the Korean Institute of Illuminating and Electrical Installation Engineers, 31, 5, pp. 75-82, (2017)
[10]  
Sim Minjeoung, Choi Daemok, Suh Dongjun, Life Cycle Cost Analysis of Solar Photovoltaics Systems in the Campus Building, Proceedings of the 2020 Winter Comprehensive Conference of the Korean Telecommunications Society, pp. 581-582, (2020)