Design of Pylon Cofferdams for Navigational Channel Bridges of Pingtan Straits Rail-cum-Road Bridge

被引:0
|
作者
Xu, Qi-Li [1 ,2 ]
机构
[1] China Railway Major Bridge Engineering Group Co., Ltd., Wuhan,430050, China
[2] State Key Laboratory for Health and Safety of Bridge Structures, Wuhan,430034, China
关键词
Cables - Piers - Trusses - Cable stayed bridges - Roads and streets - Pile driving - Embankments - Enclosures - Cofferdams;
D O I
暂无
中图分类号
学科分类号
摘要
The Pingtan Straits Rail-cum-Road Bridge consists of three cable-stayed bridges crossing navigation channels. The six pylon piers of the three bridges are mounted on dumbbell-shaped pile caps supported by pile foundations. The pile cape of pier N04 of Yuanhong Navigational Channel Bridge measures 81.0 m by 33.0 m, 9.9 m in depth, consuming 18 104 m3 of concrete. To cut down costs, the anti-collision enclosures were employed as the walls of the cofferdam during the construction of the pile caps. Based on which, base plates, tie trusses, partitions and inner bracings were added to form double-wall steel box cofferdams. An individual cofferdam measures 96.8 m (total length, including anti-collision beams) by 37.32 m (width) and 16.6 m in height, which has a draft of 12.88 m and wave resistance of 20 000 kN. The tie truss region of the dumbbell-shaped cofferdam did not require base sealing. The cofferdam was divided into zones to facilitate water pumping, and the pile cap was constructed zone by zone. The construction from hoisting and launching of cofferdam and water pumping to the completion of pile cap fell into 8 control stages. The loading conditions of the cofferdams, base sealing concreting and the pile cap concreting were simulated and analyzed by MIDAS Civil and MIDAS FEA. The results of computation indicated that the stresses in different components of the cofferdams and completed pile caps could meet the code requirements, and the design scheme was feasible. © 2021, Journal Press, China Railway Bridge Science Research Institute, Ltd. All right reserved.
引用
收藏
页码:115 / 120
相关论文
共 50 条
  • [31] Modeling and Dynamic Characteristics Analysis of the Qiantangjiang Rail-Cum-Road Bridge
    Wang, Hui
    Xia, He
    Zhan, Jiawang
    ADVANCES IN CIVIL AND STRUCTURAL ENGINEERING III, PTS 1-4, 2014, 501-504 : 1187 - 1193
  • [32] Design of Steel Truss Composite Girder of Main Bridge of Sanmenxia Huanghe River Rail-cum-Road Bridge
    三门峡黄河公铁两用大桥主桥钢桁结合梁设计
    2018, Wuhan Bridge Research Institute (48)
  • [33] Design of Three-Pylon Cable-Stayed Bridge with a Main Span over 1 000 m for Maanshan Changjiang River Rail-cum-Road Bridge
    Zhang Q.
    Liu H.
    Wang D.
    Yang C.
    Luo K.
    Bridge Construction, 2023, 53 : 16 - 21
  • [34] Key techniques for construction of Huanggang Changjiang River Rail-cum-Road Bridge
    Liu, Jie-Wen
    Zhang, Hong-Xin
    Zhou, Ming-Xing
    Deng, Yong-Feng
    Bridge Construction, 2013, 43 (02) : 1 - 9
  • [35] Key Techniques for Design of In-Situ Widening and Reconstruction of Rail-cum-Road Steel Truss Bridge
    Yan, Hai
    Chen, Liang
    Shao, Chang-Yu
    Xu, Yan
    Bridge Construction, 2019, 49 (03) : 91 - 96
  • [36] Overall Design of Yibin Jinshajiang River Rail-cum-Road Bridge on Chengdu-Guiyang Railway
    Wang, Zhi
    Mei, Xin-Yong
    Su, Yang
    Bridge Construction, 2020, 50 : 104 - 108
  • [37] Live Load Testing on Highway Composite Deck of Rail-cum-road Bridge
    Chen H.-T.
    Li D.-W.
    Zhang W.-X.
    Xie Y.-P.
    Zhongguo Gonglu Xuebao/China Journal of Highway and Transport, 2023, 36 (03): : 211 - 224
  • [38] Design and Mechanical Analysis of Gravity Rock-Socketed Anchorage for Main Bridge of Xihoumen Rail-cum-Road Bridge
    Qiu, Yuan-Xi
    Xiao, Hai-Zhu
    Liu, Jun-Feng
    Bridge Construction, 2020, 50 : 9 - 15
  • [39] Key techniques for construction of main bridge of Tongling Changjiang River Rail-cum-Road Bridge
    Zhou, Wai-Nan
    Bridge Construction, 2014, 44 (04) : 1 - 8
  • [40] Pylon Design for Main Navigational Channel Bridge of Changtai Changjiang River Bridge
    Zhang, Jin-Tao
    Fu, Zhan-Gong
    Qin, Shun-Quan
    Jiang, Zhen-Xiong
    Zhang, Rui
    Bridge Construction, 2022, 52 (05) : 1 - 7