Design of Pylon Cofferdams for Navigational Channel Bridges of Pingtan Straits Rail-cum-Road Bridge

被引:0
|
作者
Xu, Qi-Li [1 ,2 ]
机构
[1] China Railway Major Bridge Engineering Group Co., Ltd., Wuhan,430050, China
[2] State Key Laboratory for Health and Safety of Bridge Structures, Wuhan,430034, China
关键词
Cables - Piers - Trusses - Cable stayed bridges - Roads and streets - Pile driving - Embankments - Enclosures - Cofferdams;
D O I
暂无
中图分类号
学科分类号
摘要
The Pingtan Straits Rail-cum-Road Bridge consists of three cable-stayed bridges crossing navigation channels. The six pylon piers of the three bridges are mounted on dumbbell-shaped pile caps supported by pile foundations. The pile cape of pier N04 of Yuanhong Navigational Channel Bridge measures 81.0 m by 33.0 m, 9.9 m in depth, consuming 18 104 m3 of concrete. To cut down costs, the anti-collision enclosures were employed as the walls of the cofferdam during the construction of the pile caps. Based on which, base plates, tie trusses, partitions and inner bracings were added to form double-wall steel box cofferdams. An individual cofferdam measures 96.8 m (total length, including anti-collision beams) by 37.32 m (width) and 16.6 m in height, which has a draft of 12.88 m and wave resistance of 20 000 kN. The tie truss region of the dumbbell-shaped cofferdam did not require base sealing. The cofferdam was divided into zones to facilitate water pumping, and the pile cap was constructed zone by zone. The construction from hoisting and launching of cofferdam and water pumping to the completion of pile cap fell into 8 control stages. The loading conditions of the cofferdams, base sealing concreting and the pile cap concreting were simulated and analyzed by MIDAS Civil and MIDAS FEA. The results of computation indicated that the stresses in different components of the cofferdams and completed pile caps could meet the code requirements, and the design scheme was feasible. © 2021, Journal Press, China Railway Bridge Science Research Institute, Ltd. All right reserved.
引用
收藏
页码:115 / 120
相关论文
共 50 条
  • [21] Technique to Mitigate Deck-Main Truss Interaction of Steel Truss Girder by Preloading Main Truss for Pingtan Straits Rail-cum-Road Bridge
    平潭海峡公铁大桥钢桁梁预压主桁减小桥面系与主桁共同作用技术
    1600, Wuhan Bridge Research Institute (50): : 107 - 112
  • [22] Key Design Techniques of Main Bridge of Jiyang Huanghe River Rail-cum-Road Bridge
    Sun, Zonglei
    Feng, Yacheng
    Zhang, Xiaokun
    Bridge Construction, 2024, 54 (04) : 119 - 125
  • [23] Analysis of wind and rain characteristics at Pingtan strait rail-cum-road bridge site under influence of tropical depression
    He X.
    Wang Z.
    Yan L.
    Ren L.
    Guo H.
    Zhongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Central South University (Science and Technology), 2020, 51 (08): : 2081 - 2092
  • [24] Design of steel girder of main bridge of Huanggang Changjiang River Rail-cum-Road Bridge
    Wen, Po
    Yang, Guang-Wu
    Xu, Wei
    Bridge Construction, 2014, 44 (03) : 1 - 6
  • [25] Research on Design of Asymmetric Short-Pylon Rail-cum-Road Cable-Stayed Bridge with 588 m Main Span
    Yi, Lun-Xiong
    Bridge Construction, 2019, 49 (04): : 64 - 68
  • [26] Construction Scheme of Main Navigation Channel Bridge of Maanshan Changjiang River Rail-cum-Road Bridge
    Liu A.
    Shen D.
    Bridge Construction, 2023, 53 (06) : 10 - 17
  • [27] Vibration Control Techniques for Stay Cables of Main Navigational Channel Bridge of Shanghai-Suzhou-Nantong Changjiang River Rail-cum-Road Bridge
    Hu, Yong
    Chai, Xiao-Peng
    Zhao, Hai-Wei
    Wang, Zheng-Xing
    Bridge Construction, 2020, 50 (04) : 95 - 100
  • [28] Wide Cable-supported Bridges for Rail-cum-road Traffic
    Wang Yingliang
    Saul, Reiner
    STRUCTURAL ENGINEERING INTERNATIONAL, 2020, 30 (04) : 551 - 559
  • [29] Seismic mitigation and isolation design of main bridge of Sanmenxia Huanghe River Rail-cum-Road Bridge
    Liu, Jun-Feng
    Ruan, Huai-Sheng
    Ning, Bo-Wei
    Bridge Construction, 2014, 44 (02) : 91 - 95
  • [30] River Traffic Organization Schemes for Girder Construction of Main Navigational Channel Bridge of Shanghai-Suzhou-Nantong Changjiang River Rail-cum-Road Bridge
    Li, Rui-Bin
    Sun, Yong-Qiang
    Liu, Jia
    An, Yi-Ming
    Bridge Construction, 2020, 50 (04) : 112 - 117