共 54 条
[31]
Lopez M.L.N., Diaz H.L., Sanmiguel P.J.J., Gonzalez J.V.R., Transfer batch size impact on a job shop environment performance, Int. J. Manuf. Res., 12, 3, (2017)
[32]
Mastrolilli M., Gambardella L.M., Effective neighbourhood functions for the flexible job shop problem, Journal of Scheduling, 3, 1, pp. 3-20, (2000)
[33]
Mati Y., Rezg N., Xie X., An integrated greedy heuristic for a flexible job shop scheduling problem, 2001 IEEE International Conference on Systems, Man, and Cybernetics, pp. 2534-2539, (2001)
[34]
Mati Y., Rezg N., Xie X., Greedy heuristic and genetic algorithms for the multi-resource shop scheduling with resource flexibility, Proc. 8th International Workshop on Project Management and Scheduling (PMS2002), (2002)
[35]
Pach C., Berger T., Bonte T., Trentesaux D., ORCA-FMS: A dynamic architecture for the optimized and reactive control of flexible manufacturing scheduling, Computers in Industry, 65, 4, pp. 706-720, (2014)
[36]
Pezzella F., Morganti G., Ciaschetti G., A genetic algorithm for the flexible job shop scheduling problem, Computers and Operations Research, 35, 10, pp. 3202-3212, (2008)
[37]
Pinedo M.L., Scheduling, (2012)
[38]
Pranzo M., Pacciarelli D., An iterated greedy metaheuristic for the blocking job shop scheduling problem, Journal of Heuristics, 22, 4, pp. 587-611, (2015)
[39]
Rossi A., Flexible job shop scheduling with sequence-dependent setup and transportation times by ant colony with reinforced pheromone relationships, International Journal of Production Economics, 153, pp. 253-267, (2014)
[40]
Ruiz R., Stutzle T., An iterated greedy algorithm for the flowshop problem with sequence dependent setup times, The 6th Metaheuristics International Conference, pp. 817-826, (2005)