共 54 条
[1]
Afsar H.M., Lacomme P., Ren L., Prodhon C., Vigo D., Resolution of a job shop problem with transportation constraints: A master/slave approach, IFAC-PapersOnLine, 49, 12, pp. 898-903, (2016)
[2]
Azab A., Naderi B., Greedy heuristics for distributed job shop problems, Procedia CIRP, 20, pp. 7-12, (2014)
[3]
Bekkar A., Guemri O., Bekrar A., Aissani N., Beldjilali B., Trentesaux D., An iterative greedy insertion technique for flexible job shop scheduling problem, IFAC-PapersOnLine, 49, 12, pp. 1956-1961, (2016)
[4]
Benbouzid-Sitayeb F., Guebli S.A., Bessadi Y., Varnier C., Zerhouni N., Joint scheduling of jobs and preventive maintenance operations in the flowshop sequencing problem: A resolution with sequential and integrated strategies, Int. J. Manuf. Res., 6, 1, pp. 30-48, (2011)
[5]
Brandimarte P., Routing and scheduling in a flexible job shop by tabu search, Annals of Operations Research, 41, 3, pp. 157-183, (1993)
[6]
Brucker P., Schlie R., Job shop scheduling with multi-purpose machines, Computing, 45, 4, pp. 369-375, (1990)
[7]
Chan F.T.S., Wong T.C., Chan L.Y., Flexible job shop scheduling problem under resource constraints, International Journal of Production Research, 44, 11, pp. 2071-2089, (2006)
[8]
Chaudhry I.A., Khan A.A., A research survey: Review of flexible job shop scheduling techniques, International Transactions in Operational Research, 23, 3, pp. 551-591, (2016)
[9]
Chen T., Wang Y.-C., A post-classifying fuzzy-neural and data-fusion rule for job scheduling in a wafer fab - A simulation study, Int. J. Manuf. Res., 8, 2, pp. 150-170, (2013)
[10]
(2017)