共 12 条
[1]
Lin L., Wu J.L., Ma J.T., Analysis and Countermeasures of Insulation Breakdown of 35kV Cold Shrinkable Cable Terminals, Railw. Operat. Tech, 26, pp. 21-23, (2020)
[2]
Li Q., Zhao Y., Li S.L., Li X.L., Analysis of the spatio-temporal characteristics and driving force of the coupling of social security and economic development in China, Geogr. Res, 39, pp. 1401-1417, (2020)
[3]
Shangguan H., Analysis and treatment of power loss accidents in the whole station caused by 35kV cable terminal faults, Power. Equipment. Manag, 5, pp. 52-53, (2020)
[4]
Yang Y.W., Hu S., Analysis and Treatment of Fault Tripping Event of 10kV Cable Intermediate Joint, Electromechan. Inform, 9, pp. 44-45, (2020)
[5]
Qin H.X., Tan G.J., Wang Y.Q., Wang Z.J., Sun M., Design of online monitoring scheme for cable joint temperature of 10kV ring network cabinet, Electr. Design. Eng, 28, pp. 165-169, (2020)
[6]
Ying Y.L., Research and application of 10kV cable line operation quick connector transfer box, Power. Equipment. Manag, 2, pp. 67-69, (2019)
[7]
Ye J.F., Fault analysis and treatment of 35kV cable joints, Chin. Geogr. Names, 10, (2019)
[8]
Yao R.F., Hu R., Huang W.Z., Zhao X.Y., Et al., Structural design and simulation analysis of 10kV three-phase cable plug-in intermediate connector, Insul. Mater, 52, pp. 85-89, (2019)
[9]
Wang J., Qin Y., Zhang X., Wang Z., Electric field simulation of cold-shrinkable intermediate joint of 10kV AC power cable, Guangdong, Electr. Power, 31, 12, pp. 127-133, (2018)
[10]
Liu L.C., Analysis and treatment of ground faults caused by partial discharge at the middle end of 35 kV cable, Metallurg. Power, 12, pp. 8-10, (2018)