共 29 条
- [1] HE Jiahong, GORUR R S., Flashover of insulators in a wet environment, IEEE Transactions on Dielectrics and Electrical Insulation, 24, 2, pp. 1038-1044, (2017)
- [2] CHEN Hao, DENG Guangjing, WANG Yurong, Et al., Research on the secondary side problem caused by breaker rear-wiring pattern in reactor interval, Power System Protection and Control, 42, 18, pp. 122-126, (2014)
- [3] DING Tao, LI Cheng, YAN Chao, Et al., A bilevel optimization model for risk assessment and contingency ranking in transmission system reliability evaluation, IEEE Transactions on Power Systems, 32, 5, pp. 3803-3813, (2017)
- [4] ZHANG Youqiang, WANG Hongbin, DIAO Xinghua, Et al., Integrated risk assessment of intelligent substation secondary system considering the protection failure, Power System Protection and Control, 46, 22, pp. 155-163, (2018)
- [5] DAI Feng, SUN Yongjun, TIAN Tao, Et al., Reliability analysis of SF6 circuit breaker crank arm based on NESSUS, Machine Building & Automation, 46, 1, pp. 215-219, (2017)
- [6] DAS S, ANANTHAN N S, SANTOSO S., Relay performance verification using fault event records, Protection and Control of Modern Power Systems, 3, 3, pp. 226-235, (2018)
- [7] CHEN Guoping, WANG Delin, QIU Yutao, Et al., Challenges and development prospects of relay protection technology, Automation of Electric Power Systems, 41, 16, pp. 1-11, (2017)
- [8] CHEN Hao, WAN Qiulan, WANG Yurong, Short-term wind power forecast based on fat-tailed generalized autoregressive conditional heteroscedasticity-in-mean type models, Transactions of China Electrotechnical Society, 31, 5, pp. 91-98, (2016)
- [9] DUAN Jun, XIE Yeyuan, JIANG Tiangui, Et al., Reliability research and design optimization of modular multilevel converter, Electric Power Engineering Technology, 37, 2, pp. 38-43, (2018)
- [10] YANG Wenli, Comparison and selection of MV distribution network planning schemes considering reliability assessment, Electric Power Engineering Technology, 37, 2, pp. 13-19, (2018)