A bi-level programming model of rough stochastic MRCPSP in large-scale hydropower construction project

被引:0
|
作者
Zhang Z. [1 ]
Song X. [1 ]
机构
[1] School Economics and Management, Nanjing University of Science and Technology, Nanjing
基金
中国国家自然科学基金;
关键词
Bi-level programming; Multi-mode; Particle swarm optimisation; PSO; RCPSP; Resource constrained project scheduling problem; Rough stochastic parameters;
D O I
10.1504/IJADS.2020.106423
中图分类号
学科分类号
摘要
This paper focuses on developing a bi-level programming model for rough stochastic multi-mode resource constrained project scheduling problem (RS-MRCPSP/bi-level). The metal structure installation project (MSIP) in Wudongde Hydropower Station is considered as the prototype, and then it is extended to be a generalised bi-level MRCPSP. In the upper level, the construction contractor is responsible for the investment on the activity, while the outsourcing partner is in charge of construction and implementation in the lower level. In order to deal with the rough stochastic parameters, the rough stochastic expected value operator is employed. Subsequently, in order to obtain the optimal schedule, an interactive method-based passive congregation particle swarm optimisation (IM-based PCPSO) is designed. Finally, a practical application for MSIP is presented to highlight the practicability of proposed model and solution method. © 2020 Inderscience Enterprises Ltd.
引用
收藏
页码:123 / 152
页数:29
相关论文
共 50 条
  • [1] Formation optimization of large-scale UCAV based on bi-level programming model
    Zong Q.
    Qin X.
    Zhang B.
    Tian B.
    Zhao X.
    Harbin Gongye Daxue Xuebao/Journal of Harbin Institute of Technology, 2019, 51 (03): : 15 - 22
  • [2] Power Grid Construction Project Portfolio Optimization Based on Bi-level programming model
    Zhao, Erdong
    Li, Shangqi
    2ND INTERNATIONAL CONFERENCE ON MATERIALS SCIENCE, ENERGY TECHNOLOGY AND ENVIRONMENTAL ENGINEERING (MSETEE 2017), 2017, 81
  • [3] Multi-factor Incentive Pricing Bi-Level Programming Model for Construction Project
    Han Shuang
    Sun Shengxiang
    2019 INTERNATIONAL CONFERENCE ON ECONOMIC MANAGEMENT AND MODEL ENGINEERING (ICEMME 2019), 2019, : 289 - 294
  • [4] A Bi-Level Programming Method for Transmission Planning with Large-Scale Intermittent Generations Considering Stochastic Optimal Power Flow
    Gan, Lei
    Li, Gengyin
    Zhou, Ming
    Li, Hui
    Wang, Zhidong
    2014 IEEE PES GENERAL MEETING - CONFERENCE & EXPOSITION, 2014,
  • [5] A BI-LEVEL PROGRAMMING MODEL FOR CONSTRUCTION SCALE DECISION ON THE NEW AIRPORT TRANSPORT CORRIDOR
    He Changquan
    JOURNAL OF INVESTIGATIVE MEDICINE, 2014, 62 (08) : S83 - S83
  • [6] Tackling Large-Scale and Combinatorial Bi-Level Problems With a Genetic Programming Hyper-Heuristic
    Kieffer, Emmanuel
    Danoy, Gregoire
    Brust, Matthias R.
    Bouvry, Pascal
    Nagih, Anass
    IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION, 2020, 24 (01) : 44 - 56
  • [7] Bi-level optimization method for large-scale mechanical structures
    College of Mechanical Engineering, Tongji University, Shanghai, 200092, China
    Zhendong Ceshi Yu Zhenduan, 2012, 2 (234-237):
  • [8] BI-LEVEL PROGRAMMING MODEL AND ALGORITHMS FOR STOCHASTIC NETWORK WITH ELASTIC DEMAND
    Zhang, Xiang
    Wang, Hao
    Wang, Wei
    TRANSPORT, 2015, 30 (01) : 117 - 128
  • [9] Bi-level Programming Model and Algorithm for Stochastic Location Inventory Problem
    Tang Qiong
    Li Yan-hui
    ICPOM2008: PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE OF PRODUCTION AND OPERATION MANAGEMENT, VOLUMES 1-3, 2008, : 472 - 476
  • [10] Large-Scale Bi-Level Strain Design Approaches and Mixed-Integer Programming Solution Techniques
    Kim, Joonhoon
    Reed, Jennifer L.
    Maravelias, Christos T.
    PLOS ONE, 2011, 6 (09):