Multi-item single-source production quantity model for imperfect items with rework failure, inspection errors, scraps, and backordering

被引:0
作者
Taheri-Tolgari J. [1 ]
Mirzazadeh A. [1 ]
机构
[1] Department of Industrial Engineering, Faculty of Engineering, Kharazmi University, Mofatteh Ave., Tehran
关键词
Imperfect item; Inspection error; MISS; Multi-item single-source; Rework failure;
D O I
10.1504/IJISE.2021.116245
中图分类号
学科分类号
摘要
This paper represents a multi-item single-source (MISS) production quantity model for random imperfect items with repair failure, inspection errors, sales return, scraps, and backordering. In this study, it is assumed that some manufactured/produced goods might not be without fault and the first phase of inspection over the quality of goods might make some inspection errors through the classifying of imperfect/defective and perfect items. Besides, this model contains one or more steps of separation procedure that is after the rework time and there is no screening error in this period (i.e., error-free). The purpose of this investigation is to obtain the optimum cycle length and the optimal backordered quantity for each item to minimalise the total expected value cost. Finally, the numerical example is illustrated to explain and solve the studied model using our investigated innovative methodology, which is additionally clarified and explained over a sensitivity analysis. Copyright © 2021 Inderscience Enterprises Ltd.
引用
收藏
页码:291 / 327
页数:36
相关论文
共 69 条
[11]  
Chang H-C., Ho C-H., Exact closed-form solutions for 'optimal inventory model for items with imperfect quality and shortage backordering, Omega, 38, 3-4, pp. 233-237, (2010)
[12]  
Cheng T.C.E., An economic order quantity model with demand-dependent unit production cost and imperfect production processes, IIE Transactions, 23, 1, pp. 23-28, (1991)
[13]  
Chiu S.W., Optimal replenishment policy for imperfect quality EMQ model with rework and backlogging, Applied Stochastic Models in Business and Industry, 23, 2, pp. 165-178, (2007)
[14]  
Chiu S.W., Production lot size problem with failure in repair and backlogging derived without derivatives, European Journal of Operational Research, 188, 2, pp. 610-615, (2008)
[15]  
Chiu S.W., Robust planning in optimization for production system subject to random machine breakdown and failure in rework, Computers & Operations Research, 37, 5, pp. 899-908, (2010)
[16]  
Chiu S.W., Chen H-Y., Wu H.Y., Chiu Y-S.P., Mathematical modelling for a fabrication-inventory problem with scrap, an acceptable stock-out level, stochastic failures and a multi-shipment policy, Arab Journal of Basic and Applied Sciences, 26, 1, pp. 58-71, (2019)
[17]  
Chiu S.W., Chiu Y.P., Wu B.P., An economic production quantity model with the steady production rate of scrap items, The Journal of Chaoyang University of Technology, 8, 1, pp. 225-235, (2003)
[18]  
Chiu S.W., Lin H-D., Wu M-F., Yang J-C., Determining replenishment lot size and shipment policy for an extended EPQ model with delivery and quality assurance issues, Scientia Iranica, 18, 6, pp. 1537-1544, (2011)
[19]  
Chiu S.W., Ting C-K., Chiu Y-S.P., Optimal production lot sizing with rework, scrap rate, and service level constraint, Mathematical and Computer Modelling, 46, 3, pp. 535-549, (2007)
[20]  
Chiu S.W., Wang S-L., Chiu Y-S.P., Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns, European Journal of Operational Research, 180, 2, pp. 664-676, (2007)