Evaluating the mix of maintenance activities on railway crossings with respect to life-cycle costs

被引:1
|
作者
Ait-Ali, Abderrahman [1 ,2 ]
Odolinski, Kristofer [2 ]
Palsson, Bjorn [3 ]
Torstensson, Peter [2 ]
机构
[1] Linkoping Univ, Dept Sci & Technol, Linkoping, Sweden
[2] Swedish Natl Rd & Transport Res Inst VTI, Linkoping, Sweden
[3] Chalmers Univ Technol, Mech & Maritime Sci, CHARMEC, Gothenburg, Sweden
关键词
Infrastructure maintenance; Rail infrastructure; Lifecycle cost; Switches and crossings; Preventive maintenance; Corrective maintenance; Mechanical simulation;
D O I
10.59490/ejtir.2024.24.1.6885
中图分类号
U [交通运输];
学科分类号
08 ; 0823 ;
摘要
Switches & crossings (S&Cs) are vital assets as they allow for increased railway capacity by introducing flexibility and connectivity in railway networks. At the same time, this makes them critical since they can cause costly delays and disruptions if they are not well maintained. This motivates studies to improve maintenance strategies of S&Cs, considering both the life-cycle costs (LCCs) of the assets and socio-economic transportation costs for passengers and freight customers. In this paper, the interdependence between deterioration mechanisms, maintenance activities, and expected LCC (including transportation costs) for the crossing panel - an S&C subsystem - is investigated using a combination of mechanical and econometric modelling. The interrelation between the degradation of contact geometry and track settlement is analysed using simulations of dynamic vehicle-turnout interaction. Long-term mechanical degradation of the crossing panel is simulated for different maintenance strategies that correspond to different timing of the associated maintenance measures (crossing repair welding and tamping). This provides the basis for analysing the interdependence between preventive and corrective activities using econometric modelling. Based on a case study of a common type of S&Cs in the Swedish infrastructure, the impact of different maintenance strategies on LCC and transportation costs is analysed. Opportunities and challenges in the development of more economically effective maintenance strategies of S&Cs are discussed.
引用
收藏
页码:1 / 29
页数:28
相关论文
共 50 条
  • [1] LIFE-CYCLE MAINTENANCE COSTS BY FACILITY USE
    NEELY, ES
    NEATHAMMER, R
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1991, 117 (02): : 310 - 320
  • [2] Address Life-Cycle Costs and Ongoing Maintenance
    Loose, Michael K.
    Bennett, John
    Blumenauer, Earl
    Deane, Michael
    Deane, Michael
    Ehrhardt, David
    Evans, Ginger
    Herrgott, Alex
    Herrmann, Andrew
    Manous, Joe D.
    Millar, Roger
    Murphy, James K.
    Womack, Kevin
    CIVIL ENGINEERING, 2010, 80 (04): : 71 - 79
  • [3] Address life-cycle costs and ongoing maintenance
    Loose, Michael K.
    Bennett, John
    Blumenauer, Earl
    Deane, Michael
    Ehrhardt, David
    Evans, Ginger
    Herrgott, Alex
    Herrmann, Andrew
    Manous Jr., Joe D.
    Wre, D.
    Roger Millar, P.C.
    Murphy, James K.
    Womack, Kevin
    Civil Engineering, 2010, (APRIL): : 71 - 79
  • [4] Evaluating the effects of climate change on road maintenance intervention strategies and Life-Cycle Costs
    Qiao, Yaning
    Dawson, Andrew R.
    Parry, Tony
    Flintsch, Gerardo W.
    TRANSPORTATION RESEARCH PART D-TRANSPORT AND ENVIRONMENT, 2015, 41 : 492 - 503
  • [5] Evaluating Life-Cycle Energy Costs of Heritage Buildings
    Al-Sakkaf, Abobakr
    Bagchi, Ashutosh
    Zayed, Tarek
    BUILDINGS, 2022, 12 (08)
  • [6] LIFE-CYCLE PROFITS INSTEAD OF LIFE-CYCLE COSTS
    BAZOVSKY, I
    PROCEEDINGS ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM, 1974, 7 (02): : 377 - 382
  • [7] LIFE-CYCLE COSTS
    LEE, DD
    CIVIL ENGINEERING, 1980, 50 (06): : 46 - 46
  • [8] LIFE-CYCLE COSTS
    REES, RA
    ENGINEERING, 1979, 219 (04): : 403 - 403
  • [9] Evaluation of maintenance strategies by infinite horizon life-cycle costs
    Abe, Masato
    Fujino, Yozo
    Abe, Makoto
    Doboku Gakkai Ronbunshuu A, 2008, 64 (04) : 814 - 824
  • [10] CONSIDER LIFE-CYCLE COSTS
    HAHN, DM
    CIVIL ENGINEERING, 1990, 60 (10): : 30 - 30