Industrialization of Site Operations Planning and Management: A BIM-Based Decision Support System

被引:0
作者
Blampain, Felix [1 ,2 ]
Bricogne, Matthieu [1 ]
Eynard, Benoit [1 ]
Bricogne, Celine [2 ]
Pinon, Sebastien [2 ]
机构
[1] Univ Technol Compiegne, F-60203 Compiegne, France
[2] Spie Batignolles, F-92000 Nanterre, France
来源
PRODUCT LIFECYCLE MANAGEMENT: LEVERAGING DIGITAL TWINS, CIRCULAR ECONOMY, AND KNOWLEDGE MANAGEMENT FOR SUSTAINABLE INNOVATION, PT I, PLM 2023 | 2024年 / 701卷
关键词
Building Information Modelling; Product Lifecycle Management; Knowledge-Based Engineering; Enterprise Information System; INFORMATION; ARCHITECTURE; FRAMEWORK; FUTURE;
D O I
10.1007/978-3-031-62578-7_24
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Construction industry faces many challenges as socio-economical needs evolve and Building Information Modeling (BIM) disrupts practices. BIM processes and solutions are mainly suited for the design stage of a project and experts are currentlyworking to bridge the gap with the construction stage. Improving on BIM practices could be done by creating a more industrialized way of handling construction operations by learning from other industrial fields. This could help to manage quality, delay, and cost more precisely, while considering new indicators (e.g.: GHG emissions). BIM could be improved by developing a construction stage specific data structure inspired by Product Lifecycle Management (PLM) systems. This requires to dynamically manage data for different stakeholders before and during the operations. This paper presents a conceptual data framework to develop a BIM-based decision support system to plan and manage construction operations. A 4D digital mock-up is gradually enriched to support construction processes studies resulting in a As Planned view of the building. Process engineering work is carried through iterative loops and supported by knowledge-based indicators. A cross-disciplinary workflow allows the use of new production methods (e.g.: off-site modular construction). An As Built view of the mock-up is concurrently created as operations advance and changes occur, feeding back the knowledge-based indicators.
引用
收藏
页码:253 / 262
页数:10
相关论文
共 28 条
[1]  
[Anonymous], 2018, P CREAT CONSTR C 201, DOI DOI 10.3311/CCC2018-134
[2]  
[Anonymous], 2018, BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors
[3]  
Aram S., 2013, Integration of PLM Solutions and BIM Systems for the AEC Industry, DOI [DOI 10.22260/ISARC2013/0115, 10.22260/ISARC2013/0115]
[4]  
Blampain F., 2022, P INT JOINT C MECH D
[5]  
Blampain F., 2023, EduBIM, P176
[6]   The challenge of level of development in 4D/BIM simulation across AEC project lifecycle. A case study [J].
Boton, Conrad ;
Kubicki, Sylvain ;
Halin, Gilles .
CREATIVE CONSTRUCTION CONFERENCE 2015, SELECTED PAPERS, 2015, 123 :59-67
[7]   Designing adapted visualization for collaborative 4D applications [J].
Boton, Conrad ;
Kubicki, Sylvain ;
Halin, Gilles .
AUTOMATION IN CONSTRUCTION, 2013, 36 :152-167
[8]  
Bricogne M., 2011, INT C SMART SUSTAINA, P47, DOI [10.1049/cp.2011.0284, DOI 10.1049/CP.2011.0284]
[9]   GRAI integrated methodology and its mapping onto generic enterprise reference architecture and methodology [J].
Chen, D ;
Vallespir, B ;
Doumeingts, G .
COMPUTERS IN INDUSTRY, 1997, 33 (2-3) :387-394
[10]   Integrated BIM-based simulation for automated time-space conflict management in construction projects [J].
Dashti, Mohammad Saleh ;
RezaZadeh, Mohammad ;
Khanzadi, Mostafa ;
Taghaddos, Hosein .
AUTOMATION IN CONSTRUCTION, 2021, 132