Human-centric robotic assembly line design: a fuzzy inference system approach for adaptive workload management

被引:2
作者
Ghorbani, Elham [1 ]
Keivanpour, Samira [1 ]
Sekkay, Firdaous [1 ]
Imbeau, Daniel [1 ]
机构
[1] Polytech Montreal, Dept Math & Ind Engn, Montreal, PQ, Canada
关键词
Assembly line design problem; Ergonomic risks; Fatigue and recovery model; Fuzzy expert system; Industry; 5.0; Supportive robots; PHYSICAL WORKLOAD; BALANCING PROBLEM; ERGONOMIC RISKS; MODEL; OPTIMIZATION;
D O I
10.1007/s00170-024-14282-4
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In the transition from Industry 4.0 to Industry 5.0, the integration of human-centric considerations into manufacturing processes becomes vital. This study advances beyond conventional Industry 4.0 frameworks by introducing a novel fatigue model that emphasizes ergonomic risk management during the design phase of robotic assembly lines. Utilizing a hybrid model that employs a fuzzy inference system based on ergonomist knowledge, this fuzzy approach manages the imprecise nature of ergonomic optimization more accurately than deterministic models and effectively reflects real-world complexities. By evaluating fatigue at both task and worker levels, this fuzzy inference mechanism addresses technical aspects through feasibility studies and significantly improves ergonomic outcomes. The integration of supportive robots is explored through scenario-based analysis, highlighting productivity enhancements and substantial ergonomic benefits in line with Industry 5.0's focus on enhancing worker well-being and operational resilience. The proposed heuristic algorithm enables decision-makers to identify the most efficient solutions tailored to individual preferences, showcasing flexibility and real-world applicability. Empirical validation, enriched with synthesized ergonomic-oriented instances, confirms the superiority of this approach in creating more sustainable and ergonomically optimized assembly lines. Implementing this approach is predicted to decrease system costs by up to 47%, particularly advantageous during human resources crises, by reducing ergonomic risk, recovery needs, and additional capacity requirements for fatigue mitigation. This study contributes to the discourse on the practical implications of Industry 5.0 and demonstrates its applicability in designing ergonomically optimized assembly lines that prioritize long-term productivity and worker satisfaction.
引用
收藏
页码:3805 / 3827
页数:23
相关论文
共 54 条
[31]   Sustainability Balanced Scorecard Approach to Internet of Things Enabled Logistics Systems [J].
Keivanpour, Samira .
ENGINEERING MANAGEMENT JOURNAL, 2022, 34 (03) :450-474
[32]   Considering physical workload and workforce diversity in a Collaborative Assembly Line Balancing (C-ALB) optimization model [J].
Keshvarparast, Ali ;
Battaia, Olga ;
Pirayesh, Amir ;
Battini, Daria .
IFAC PAPERSONLINE, 2022, 55 (10) :157-162
[33]   Human-robot collaboration in assembly line balancing problems: Review and research gaps [J].
Kheirabadi, Mahboobe ;
Keivanpour, Samira ;
Chinniah, Yuvin Adnarain ;
Frayret, Jean-Marc .
COMPUTERS & INDUSTRIAL ENGINEERING, 2023, 186
[34]   A new muscle fatigue and recovery model and its ergonomics application in human simulation [J].
Ma, Liang ;
Chablat, Damien ;
Bennis, Fouad ;
Zhang, Wei ;
Guillaume, Francois .
VIRTUAL AND PHYSICAL PROTOTYPING, 2010, 5 (03) :123-137
[35]   A new simple dynamic muscle fatigue model and its validation [J].
Ma, Liang ;
Chablat, Damien ;
Bennis, Fouad ;
Zhang, Wei .
INTERNATIONAL JOURNAL OF INDUSTRIAL ERGONOMICS, 2009, 39 (01) :211-220
[36]   Optimizing ergonomics in assembly lines: A multi objective genetic algorithm [J].
Mura, Michela Dalle ;
Dini, Gino .
CIRP JOURNAL OF MANUFACTURING SCIENCE AND TECHNOLOGY, 2019, 27 :31-45
[37]   A fuzzy assembly line balancing problem with physical workload constraints [J].
Mutlu, Ozcan ;
Ozgormus, Elif .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (18) :5281-5291
[38]   Systematic data generation and test design for solution algorithms on the example of SALBPGen for assembly line balancing [J].
Otto, Alena ;
Otto, Christian ;
Scholl, Armin .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2013, 228 (01) :33-45
[39]   Incorporating ergonomic risks into assembly line balancing [J].
Otto, Alena ;
Scholl, Armin .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2011, 212 (02) :277-286
[40]   Fuzzy multi-objective model for assembly line balancing with ergonomic risks consideration [J].
Ozdemir, Rifat ;
Sarigol, Ilkan ;
AlMutairi, Sarah ;
AlMeea, Sarah ;
Murad, Abrar ;
Naqi, Aseel ;
AlNasser, Noor .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2021, 239