Research on two-machine flow shop scheduling problem with release dates and truncated learning effects

被引:19
作者
Lv, Dan-Yang [1 ,2 ]
Wang, Ji-Bo [1 ,2 ]
机构
[1] Shenyang Aerosp Univ, Sch Mechatron Engn, Shenyang, Peoples R China
[2] Shenyang Aerosp Univ, Minist Educ, Lab Rapid Dev & Mfg Technol Aircraft, Shenyang, Peoples R China
关键词
Scheduling; release date; truncated learning effect; flow shop; dominance condition; SINGLE-MACHINE; MINIMIZE;
D O I
10.1080/0305215X.2024.2372633
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this article, a two-machine flow shop scheduling problem with release dates and truncated learning effects is studied. The objective is to find a sequence such that the total completion time is minimized. This problem is NP-hard and cannot be solved in polynomial time. Therefore, a branch-and-bound algorithm (dominance conditions, lower bounds and an upper bound are needed) and an heuristic algorithm are proposed. In addition, simulated annealing and tabu search are developed to obtain near-optimal solutions for the problem. A large number of computational tests have been conducted, and the data show that the branch-and-bound algorithm can handle small-sized problems effectively within 14 jobs, while the proposed heuristic algorithm has a shorter running time for large-sized problems.
引用
收藏
页码:1828 / 1848
页数:21
相关论文
共 52 条
[51]   Scheduling jobs with general truncated learning effects including proportional setup times [J].
Zhao, Shuang .
COMPUTATIONAL & APPLIED MATHEMATICS, 2022, 41 (04)
[52]   RESOURCE ALLOCATION FLOWSHOP SCHEDULING WITH LEARNING EFFECT AND SLACK DUE WINDOW ASSIGNMENT [J].
Zhao, Shuang .
JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2021, 17 (05) :2817-2835