共 52 条
Research on two-machine flow shop scheduling problem with release dates and truncated learning effects
被引:19
作者:
Lv, Dan-Yang
[1
,2
]
Wang, Ji-Bo
[1
,2
]
机构:
[1] Shenyang Aerosp Univ, Sch Mechatron Engn, Shenyang, Peoples R China
[2] Shenyang Aerosp Univ, Minist Educ, Lab Rapid Dev & Mfg Technol Aircraft, Shenyang, Peoples R China
关键词:
Scheduling;
release date;
truncated learning effect;
flow shop;
dominance condition;
SINGLE-MACHINE;
MINIMIZE;
D O I:
10.1080/0305215X.2024.2372633
中图分类号:
T [工业技术];
学科分类号:
08 ;
摘要:
In this article, a two-machine flow shop scheduling problem with release dates and truncated learning effects is studied. The objective is to find a sequence such that the total completion time is minimized. This problem is NP-hard and cannot be solved in polynomial time. Therefore, a branch-and-bound algorithm (dominance conditions, lower bounds and an upper bound are needed) and an heuristic algorithm are proposed. In addition, simulated annealing and tabu search are developed to obtain near-optimal solutions for the problem. A large number of computational tests have been conducted, and the data show that the branch-and-bound algorithm can handle small-sized problems effectively within 14 jobs, while the proposed heuristic algorithm has a shorter running time for large-sized problems.
引用
收藏
页码:1828 / 1848
页数:21
相关论文