共 35 条
- [1] [Anonymous], 2020, ONS - Submodule 2.10 - Minimum technical requirements for the connection to the transmission system
- [2] [Anonymous], 2007, Report PE-DEE-RE-097/2007-r1 - AHE Santo Antonio - Technical Viability Study - Project Optimization